Laserfiche WebLink
City of Santo Ana <br />• Submit 30-, OD-, and I DO-Porcent PIRhS to those utility companies with facilities In Immediate project area for <br />review and comment. <br />• Coordinate with ufllty companies to Implement upgrade of facilities (upon request), as needed, within project <br />limit and Maintain contact log. <br />• Werntine any utility upgrades or Installations that will be required to service existing and proposed Improve- <br />rrients and coordinate Installation of required upgrades with each affected utility company <br />• Lead efforts to Identify ownership of un1mown utility lines <br />Took 3 — Environmental Compliance and Permits — OpV*n A and Option B <br />It Is anticipated that the projects will qually for Categorical Exemption Section 16301 class 1 (0) under existing <br />highways and streets Improvements that allows for roadway Improvements for the purpose of public safety and <br />has no significant effects on the onvironiment. Wflldan will perform its due diligence as part of this task to verify <br />exemptions criteria set by California Environmental Quality Ad (CEQA) under Article 19 of Categorical Exomp- <br />gone and make necessary recommendations to the City, The City's Planning Division will make the final environ- <br />mental determination. To sallsfy CSQA requirements for the project, Willclon will prepare a notice of exemption <br />for the City's use. We will assist with posting of the notice and with filing the Notice of Exemption with the County <br />Clark. <br />9 WHIclan believes that further detailed arrvirartmental studies and reports are needed to comply with CEQA and <br />or National Environmental Protection Act (NEPA), subject to confirmation by City Staff, Wilidan will most and dis- <br />cuss with the applicable resource/ragulatory agencies to confirm the necessary work effort and Identity the cost <br />and schedule to prepare the environmental reports, applications for <br />permits arid obtain clearance through all applicable agencies as addl- 12 *rask 3 Dellverables <br />tional scope of wok As part of Clean Water Act, a NPDES permit CEQA Categorical Exemption <br />may be required for alternate discharging during well rehabilitation. Form <br />Took 4 — Preliminary 15inglinearing — Option A and Option B <br />Subtask 4.01 — Site Vlaft and Evaluation. Visual Inspection is Important for quality assurance and ensures a <br />;Tt Wi � � it i I W� *a-n d"e-c-m"s t' r' a In"t, s*-. W", 9 1 d --- a n -v,A- 1-1 c -a-t aw og -a x- -1 a-i In, I r-,'o h d' 1110- n s -0, r d _f a -c I RK I e- -9 th r- c u- g h - p h o 164 r a p h a a r i d I I id <br />: r i <br />notes to be used as a reference during design. <br />An Initial assessment will be performed to evaluate the existing condition of the water well. Based on the Initial <br />evaluations, rehabilitation options will be proposed. The entire well will have to pulled and the casing will have to <br />be video Inspected. Common causes of reduced well capacity could be sanding, rupture of casing, mineral bul* <br />up, heavy encrustation, screen damage, screen dogging or mechanical failures of the pump. Depending on the <br />assessment, rehabilitation could include brushing and boiling casing, replacing ruptured casing, adding an elon- <br />gated nozzle to bull to reduce sand flow, chemical treatment, remachine the pump and or rewind. After the initial <br />evaluation, Willdan will work with Chys current maintenance arid repair contractor to rehabilitate the well or will <br />work with the City to bid out the project <br />Subtask 4.02 — Field Survey and Right -of -Way. WHIdan Will perform a field survey to ensure the o0ouracy <br />and constructability of the final construction plans. For this project the survey will: <br />A Establish right-of-way through record research andicir survey. <br />0 Option A: Ground Survey to map the existing facilities and utility Subtask 4.02 Poliverables <br />1J <br />alignment, The utility survey will Include manholes, covers, and One electronic copy of all field sur- <br />depth of cover when required. vey data In Microstation V81 format <br />0 Option 8, Topographialground survey will be required to deter- <br />mine existing grades and facilities. To ensure acceptable cross -slopes full street sections will be surveyed <br />and analyzed at 2Voot intervals, driveways, and at approaches. The topographic survey shall extend a mini- <br />mum of 200 feet beyond limits of construction within the public righl-of-way, where possible. Full street see- <br />tIons Include obtaining field data at all control or critical points, such as CL, BOR, ECR, and at any grade <br />breaks between lips of gutters, and(or edges of pavement, and flow lines: Where applicable to the project <br />scope, survey'of private property Improvements shall be Included. <br />Subtask 4.03 — Gootechriloal Investigation and Pavement Rehabilitation Strategies. All peotechniod <br />Investigation and analysis shall be performed by a state -licensed gootachnical engineer with expertise In pave- <br />ment design, Willclan will conckict geotechnlcal Investigations to measure the existing pavement sections and <br />collect representative samples of subgrade, solls for laboratory testing as described below. The task work In - <br />dudes: <br />Proposal for OrpCall Enginsortri& <br />Lrco mprehonsive. Innovative. Trusted <br />RFP No. V-083 <br />25E-734 <br />