Laserfiche WebLink
RESOLUTION 2018 -XXX <br />3.88% <br />l <br />PROPOSED <br />REVENUE <br />FY 17-18 <br />FY 18-19 <br />- <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />FEES <br />SECTION IX <br />PLANNING &BUILDING AGENCY <br />' <br />51603 <br />6) <br />Fire alarm communications, data control systems, smoke <br />detectors and low voltage system:'i <br />Commercial (charge by number of devices):-- <br />0-10 total devices <br />Each <br />26.20 <br />27.22 <br />T <br />10 or more total devices <br />2.12 <br />2.20 <br />�` J <br />Each control panel, standby power supply panel, <br />annunciator panel or similar main piece of <br />control equipment for one of the above systems. <br />Each <br />12.29 <br />12.76 <br />1 <br />Residential charge by number of dwelling units): <br />LJ <br />Residential unit (1) <br />26.79 <br />27.83 <br />rl <br />Each add'I residential unit in a multiple -dwelling <br />' <br />occupancy <br />Each <br />16.07 <br />16.69 <br />:i <br />Each add'I residential unit over 20 in a hotel, motel, <br />boarding house or lodge <br />Each <br />9.72 <br />10.10, <br />51603 <br />7) <br />Dedicated circuit <br />Each <br />12.29 <br />12.76 <br />51603 <br />8) <br />Service Meters, Reset Meters, Subpanel, Switchboard, Motor <br />rrr <br />Control Center, or similar equipment changes or additions. <br />.- ., <br />599 volts or less, under 400 amps. <br />Each Meter <br />37.21 <br />38.65 <br />;- 1 <br />599 volts or less, 400 amps and less than 1200 amps. <br />Each Meter <br />93.17 <br />96.78 <br />r- a <br />598 volts or less, 1200 amps and over. <br />Each Meter <br />187.37 <br />194.64- <br />51603 <br />9) <br />Signs and high-potentlal gas tube lighting, each <br />Each <br />37.21 <br />38.65 <br />Note: This shall include all necessary control equipment <br />51603 <br />10) <br />Swimming pool, fountain, spas, each <br />Each <br />82.28 <br />95.47 <br />51603 <br />11) <br />Above ground spas <br />Each <br />26.49 <br />27.52 <br />2. <br />51603 <br />12) <br />Temporary power -construction: <br />For services supplying a temporary power pole, <br />Each <br />64.69 <br />67.20 <br />pedestal or piggyback <br />Ld <br />For a system of distribution and utilization of poles <br />Each Pole <br />12.29 <br />12.76 <br />for temporary construction power, each pole <br />L! <br />51603 <br />13) <br />Temporary construction lighting: <br />500 lamps or less <br />5.54 <br />5.75 <br />a <br />Over 500 lamps <br />9.66 <br />10.04 <br />r , <br />LJ <br />56 <br />