My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FY 2018-19 PROPOSED MISCELLANEOUS FEES SCHEDULE_75A-1
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
PROPOSED CITY BUDGET FY 2018-2019
>
FY 2018-19 PROPOSED MISCELLANEOUS FEES SCHEDULE_75A-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 7:41:34 AM
Creation date
6/26/2018 1:58:37 PM
Metadata
Fields
Template:
City Clerk
Agency
Finance & Management Services
Item #
75A-1
Date
6/19/2018
Notes
FY 2018-19 PROPOSED MISCELLANEOUS FEES SCHEDULED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2018 -XXX 3.88% <br />PROPOSED <br />REVENUE FY 17-18 FY 18-19 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br />SECTION IX PLANNING& BUILDING AGENCY <br />51603 <br />14) <br />Temporary services: <br />At the time of application for temporary power, the owner <br />shall post a $1,000 cash or cashier's check conforming to the <br />Santa Ana Municipal Code Section 8-1768 for each service <br />meter. This deposit shall be released upon request after the <br />Certificate of Completion or Certificate of Occupancy Is Issued. <br />Temporary Electrical Service, Prior to Approval <br />Each Meter <br />234.98 <br />244.09 <br />Or Occupancy (30 Days) <br />Temporary work with service, each meter <br />Each Meter <br />32.72 <br />33.99 <br />51603 <br />15) <br />Lighting standards: <br />With one (1) fixture each <br />Each <br />12.29 <br />12.76 <br />Each additional fixture on the same standard <br />Each <br />3.55 <br />3.69 <br />51603 <br />16) <br />Time clock or photo electric cell, each <br />Each <br />9.66 <br />10.04 <br />51603 <br />17) <br />Radiant ceiling heat per room <br />Per Room <br />12.29 <br />12.76 <br />51603 <br />18) <br />Power apparatus: generators, motors, transformers, <br />rectifiers, synchronous converters, capacitors, <br />industrial heating, cooking or baking equipment, and <br />other apparatus as follows: <br />(Ratings- horsepower (HP), kilowatts (KW), and <br />Kilovolt amps (KVA)) <br />Up to and including 1 HP, KW, KVA each <br />Each <br />5.01 <br />5.20 <br />Over 1 and not over 10 HP, KW, KVA each <br />Each <br />12.93 <br />13.43 <br />Over 10 and not over 50 HP, KW, KVA each <br />Each <br />26.20 <br />27.22 <br />Over 50 and not over 100 HP, KW, KVA each <br />Each <br />56.13 <br />58.31 <br />Over 100 and not over 500 HP, KW, KVA each <br />Each <br />74.77 <br />77.67 <br />Over 500 HP, KW, KVA each <br />Each <br />93.17 <br />96.78 <br />51603 <br />19) <br />Demolition, per project <br />Per Project <br />36.28 <br />37.69 <br />51603 <br />20) <br />Inspections outside of normal business hours (four hour <br />Per Hour <br />93.17 <br />96.78 <br />minimum charge for Holidays, Saturday or Sunday <br />Inspections) <br />57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.