Laserfiche WebLink
RESOLUTION 2018 -XXX <br />3.88% <br />PROPOSED <br />REVENUE <br />FY 17-18 <br />FY 18-19� <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />FEES <br />r"k <br />SECTION IX <br />PLANNING& BUILDING AGENCY <br />51603 <br />21) Re -inspection fee assessed under applicable provisions <br />Per Hour <br />93.17 <br />96.78 <br />' <br />of the Building Code <br />rr9 <br />51603 <br />22) Inspections for which no fee is specifically <br />Per Hour <br />93.17 <br />96.78 <br />Indicated (minimum charge - one (1) hour) <br />rP <br />53601 <br />23) Additional plan review required by changes, additions, or <br />Per Hour <br />93.17 <br />96.78 <br />revisions to approved plans (minimum charge - one (1) hour) <br />`-" <br />ELECTRICAL PLAN CHECK FEES"I <br />Whenever electrical plans are required by the Building` <br />Official, plan check fees shall be 65% of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br />' <br />51604 <br />MECHANICALCODE <br />Any person desiring a permit required bythe Mechanical <br />Each Permit <br />44.54 <br />46.27 <br />Code shall, at the time of filing an application, pay a fee <br />` <br />of $46.27. There is no minimum fee for the issuance of <br />for single family residences and duplexes. The <br />permit <br />7 <br />minimum total fee for issuance of a permit for all other uses <br />shall be $75.61. <br />72.79 <br />75.61 <br />j <br />FEE SCHEDULE <br />r <br />51604 <br />1) For the installation or relocation of each forced -air or <br />Each <br />32.50 <br />33.76 <br />gravity -type furnace or burner, including ducts and <br />lJ <br />vents attached to such appliance, up to and including <br />100,000 BTU/h <br />L <br />51604 <br />2) For the Installation or relocation of each forced -air <br />Each <br />46.41 <br />48.21 <br />or gravity -type furnace or burner, including ducts <br />and vents attached to such appliance over 100,000 BTU/h <br />51604 <br />3) For the installation or relocation of each boiler, compressor, <br />Each <br />56.13 <br />58.31 <br />condensing unit or heat pump up to and including five <br />horsepower, or each absorption system to and Including <br />100,000 BTU/h <br />LJ <br />51604 <br />4) For the installation or relocation of each boiler, <br />Each <br />56.13 <br />58.31 <br />•i <br />compressor, condensing unit or heat pump over five <br />horsepower up to and including 30 horsepower or <br />J <br />for each absorption system over 100,000 BTU/h up <br />to and including 1,000,000 BTU/h <br />' <br />LJ <br />58 <br />