My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC.
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 5:24:44 PM
Creation date
7/17/2018 3:57:34 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC.
Contract #
A-2018-160-03
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
9/1/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
More specifically for this proposal the City is seeking submittal of qualifications for two options. Design and construction support services for: <br />OF11011 A: WATER RESOI_IRC)Ez, <br />• Rehabilitation of a 30 year old water well <br />* 150D LF of domestic water design (12" PVC) <br />+ 600 LF of sewer design (15" Material TDD) with arterial street <br />PRELIMINARY ANALYSIS: <br />1. SewerMateriek Many factors should be considered when determining the best material for sewer construction. These include: <br />» Corrosion » Weight <br />» Abrasion » Imperviousness <br />» Strength » Cost <br />» Durability » Hydraulic Efficiency <br />Of the many materials available each offers a set of unique advantages and disadvantages, For a 15" pipe, the material most <br />commonly used In local cities under an arterial roadway would be vitrified clay pipe (VCP). It performs well in typical urban loading <br />conditions and maintenance departments are well prepared to work with It. Our experience would have us assume VCP will be high on <br />the list of options. <br />2. The City has determined that the existing water well performance dropped by 35%. This percent Is above the 25% rule of thumb that <br />would indicate It's time for rehabilitation. The RFP mentions that the water well Is a sand producer but does not Indicate if the sand <br />production has Increased. It is our assumption that the City has concluded that the sand production rate is within an acceptable range <br />and that the information is meant to determine that the aquifer type is "Sandstone' The most prevalent water well problems for this <br />type of aquifer would be: <br />FISSURE PLUGGING - CASING FAILURE - SAND PRODUCTION - CORROSION <br />The anticipated maintenance frequency for a sandstone aquifer would average 8 years. If the well has dropped 35% over 15 years this <br />is within the anticipated limits and sand production has not increased, casing failure is unlikely. It is also our assumption that surface <br />equipment has been evaluated and that the well was constructed with corrosion in mind. This leaves plugging as the likely cause for <br />loss of productionl We anticipate that further evaluation will lead to the following rehabilitation methods: <br />A. Aqua Freed CO2 Injection; Effective at removing mineral incrustation, biological fouling, and physical plugging. Provides extensive <br />geological penetration, it is 100% green, and environmentally sound with no adverse chemical waste stream. <br />R. Chemical and Acid Cleaning: Used in Conjunction with pumping and surging it is effective at dissolving minerals and impacting biological <br />activity and physical plugging of sands. The chemical solution is tailored specifically for the plugging problem. It offers limited geological <br />formation penetration and produces a waste stream of spent chemicals that most be neutralized and disposed of properly. <br />OPTION i3: fJENFRFII..EIVi31tVELRIN(t {p"IITLR THAN vvuER RESOURCES} <br />• Conceptual street widening and rehabilitation including parkway improvements <br />• New bike lane <br />• Intersections are complete <br />PRELIMINARY ANALYSIS - <br />1. E cluslons <br />» Traffic signals and median design <br />» Traffic Report <br />» Right -of -Way Services <br />2. Assumptions <br />» Water, sewer, and dry utilities will be protected in place <br />» Storm drain will require retrofit to new curb and gutter alignment <br />» Must meet water quality requirements <br />HUITT-ADHARS <br />» Manholes and valves will be adjusted to grade <br />» Street lights and Illumination design required <br />» Sound wall required <br />City of Santa Ana Civil Engineering Services: RFP 17-083 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.