My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC.
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 5:24:44 PM
Creation date
7/17/2018 3:57:34 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC.
Contract #
A-2018-160-03
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
9/1/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our QA/QC; program sets a procedure that ensures deliverables for both options A and B most your expectations, As an ISO 9001:2015 <br />compliant firm, the Quality Management Program serves as the foundotinn for tiontiouous Improvement in alt aspects of our MR. for our staff <br />OuslityAssurance Is more than Just a program that ensures proper Internal revlow-and documentation, It Is a items oferilho with which we approach <br />our work. The procodatbTvlll help as dollverhigh quality plans at 80%. 60%, and final submittal, <br />actwitles accessary tomnsure that <br />of experienced <br />eoordiliStlon, I <br />records, <br />The <br />close out via our <br />We are proposing a highly -specialized team of registered professionals with a history of delivering on similar projects, Ateo'm with a bench <br />strength unmatched In the Indoetry, Our project manager will be assisted by the principal -In charge and suppoited,by kdypetsannel. The staff we <br />ore cemmittingis-organized,sothattodpodoitleadership Isavailable Incriticalaspectsofdpsign, tlurteamotfersaddltip0pivatpebacauso.itwlf <br />rigorouslyebatyzo tr dogigA bs pmvfdrrsustdttlahl6 c'mat offectividulutitlns, <br />i AUVANCEQESIHN--Toeffeowely.lndarpdratsedvancelhAdvativedas <br />i prepared, Our team approach wiu explore design from all sides,, meirt,t <br />overlooked. Our designprocessjsInteractive onqraspopsjve.ltepilaps <br />the rljtetuirfoi <br />r <br />is, it is ImparatWa to soleuk team ihhfhds llaoit probe v' <br />naw angi'eo; and harp uncayer perap8ptivas;that ora <br />relevant to the success of theprejaot. Vkhave•asseptbiacttatr <br />d: <br />Is <br />and constraintsforthe project. <br />a <br />Work ttreekdown Wootare - MultRollors will develop a Work Breakdown Structure (WBS) that Identifies specific toeks needed to accomplish <br />the proposed scope of services, We will determine the level of effort requirad for each discipline to complete each task underthe WBS. This effort <br />is used to establish the proposed compensation for the project and helps overcome potential budgetchallengas. <br />eclat/edPra�oGtSehedale <br />characteristics comprise our approach to developing and maintaining a realistic schedule. Thisstartswlth <br />participation of the entire prajeik team. Itis lmporativa that the schedule be sensitive to tho demands of evarydisciptine and ollent review poribds. <br />Aschedule most occount,for stakeholder considerations and include time contingencies,for rosoiving unforossep variables. Our PAj is assigned the <br />responsibilityof.davelopingandtrachingtheprojectschedule.OurWBSformat-allowsWPMtoreviewbudgetsagainstassoolstedmilestones. We <br />require that the PM update tho.Prinotpal with project progress weekly. This results Ina sense of urgencythat will benefit each project. <br />t Quality project delivery can belmpacted by many things. Mowavar, there are fivo. areas that will demand our focus. <br />We will design both projects A and B as the City intended to design them. This will be accomplished by listening and clearly understanding year <br />expectations. We will confirm our understanding in nor negotiated scope and verity that we are on track by conducting design review meetings on <br />a regular basis from planning. through final design, <br />s WewIB design bath projects A and B asthe City Intended to design them. This will be accomplished by listening and clearly understanding <br />your expectations, We will confirm our understanding In out negotiated scope and verify that we are on track by conducting design review <br />meetings on a regular basis from planning through final design. <br />v We will most with sub -consultants to ensure their scope is complete, <br />HUl"ff ADLLIAfZS City of Santa Ana Civil Engineering Services: RFP 17-083 7 <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.