My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC.
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 5:24:44 PM
Creation date
7/17/2018 3:57:34 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC.
Contract #
A-2018-160-03
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
9/1/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 0: 0eataahnical 5tudies/keportsl8oring- Revlewexisting geotechnical report and prepare a comprehensive geotechnlcal investigation <br />including adequate borings for proper design of proposed work, Obtain required permits to conduct geotochnical Investigations and perforin <br />applicable lob testloprovtdeinformatlonnecessary for Acomprehensive design, Adraft copy ofthegeotephntealfppgrtwill beprovldedfor rovlew <br />and comment. Traffic control in accordance with W.A.T.O.H. Mansai. <br />$nb-1'4skPoveMpetvaWillpa- Excluded but maybe raqulieg,for Option 9 <br />Sob-fask ESA Phase 7-daterrad: Acquisition Sorvi* Task <br />f, <br />&b-faskUAPhis#$—Deferred: ktiolsitlimSdrVI0iWTask <br />I TASK E:TrstfieSfp�yrRapert-6xcluded <br />I <br />TASK f: EaWronmenMl.(CERA)—Exclusionsfor.bothflptions. <br />TASK G: GighNI-Voy Acquisition andlkampprary;f onslrgatlon Insilmonlis OCEs) 'Mint—ofWpy ao0t4PkIoA Is'e"loded, MZ wiy'lncorporatethe <br />piefelrod,preclosaiignmentInto the VIOCADiiFiles, Plana will beavaluutsd'andTC11iwould beprovided, ifipemsarti. <br />TASK H: Draldaga-Huitt-tailarspropasestalmplNmatrtfhbYadafi'nisnllati0nuftomtltsdraft.CityWiifexLDs20rdadeltKataceauntaforba0kwni� <br />affePts on the storm drelrr infrasfruatule, Sizing of'tha lntrsstrtraEgmtirill be bpsad On burn kydmfogy gnd Aydrauiic AglCAutatians to bepfepafad <br />r espuriafthadruidagVtepartAMilminaidraloAgeiepottwillbearedtod-irlehgwRlrthe30%tobidittel.ACinyldrainegnrapditwiilba raGtded <br />with the limit submittal. <br />.r <br />y TASK I: Wolorgp lityiMpisphiontPlan(W4RP) <br />$ub-lask 11 -The design will accoont for the 50% rule In to#100d MS4 Permit, Will tagdimi trestrnont1Q BDt6 of added or ygloCed <br />r impervious areas: Ik wdl implore" green street prinoiplQs to tbs rttaxlmufi axtnnt pra4klpabfa, K.the undeilyint opli doss not InKltrate we <br />r anticipate pslog the parkway to provide bio-Trltration. HZ wiilpmpam a Praflmihag wo it the * stege that identify pdtb0iial Iocathnira for <br />LiD BMPs and their interactions with the cosite storm drain network. V wiil,devolbp fire Preliminary WAA)Pinto a Final WdMP eonsfatant with <br />the County's Ticholcal Ouidgnce Manuel •to eecampsny tliu Dna) sgbmltial. Tbis-will-include ansngiuoers-eetimate of probablecobts inclusive <br />of material, freight, sod Maintenance WIN MOM BMN. <br />Snb-7ask UAW— Deferred: Construction Oil Task <br />TASK 1: plans,BpaolDcallonp,and EsOmates,IPS&E)4HZ will adhere to cllyclfteria,pollofes,procadure,and.standards. PS&Elooiudo&three <br />1 Milostone dsllverables--30%.60%, and Final. tech after HE has received roviewcommentsfrom the proviuus milastons. <br />submlttal, Hi will meet WKh, the Ctty sfter comments have been reviewed tot resolve questions, All plan sheets will bo prepared at -20 scale unless <br />otherwise approved and noted. <br />I <br />I Sub-rask.l f $beet Mprovementa - HZ will match the precise alignment of the -constructed street, Plans Will include record Information <br />regarding Willies, obstructions, and apputtenmht data. <br />S00-11101:2 "Noposign <br />Street Signals -Excluded <br />theonellxatlon Pion & Data.IIs-Plans Will be completed to meet CaiifomioMOTCD standard, signals wlll be ovaluated and updated for proposed <br />lane.conflgtmtion. <br />Temporary Traffic Centre Plans- Deferred: Construction Did Task <br />Sob-laskl.SSterm Drab Deslgn- Drainage improvement plans will be prepared at the different milestones, Backbone $term drain prof les will <br />be provided along with the 30% submittal. Profiles for lateral storm drains and storm drain detail sheets will be provided at the 60% sod final <br />submittals. <br />Sgb4askl.4Wall Daslgn- Design of mosomy wall height as specified by sound report or City but not to exceed 12'feat <br />Sound Report -Provided by City <br />$ub-laskl,SSheatGighf/ngda ElenrrfoalUasJgn-Typisailysxisting streotiights are owned by SCE. if the proposed improvements relocate more <br />than three street lights the proposed lights will be owned by the CityofSanta Ann. Street lighting design standards Will be coordinated with the <br />City of Santa Ana prior to commencing the design. the design will be par City of Santa Ana lighting standards and considerstlon will be given <br />to salvaging the existing light fixtures. <br />Sub-Tssanandscapingand lrrigavan 00$4p- Conceptual landscape and irrigation plans will be prepared to eonformanoewith City of Santa <br />Ana standards. Our landscape designers will waft closely with our engineers to plan, design, and coordinate gateway features, public an, traffic, <br />and pedestrian lighting, signage, and site amenities. Our team will coordinate with the City to responsibly design landscape and irrigation <br />systems. Plantlog and irrigation will be mindful of water conservation standards, <br />r"f -ADLM City of Santa Ana Civil Engineering Services: RFP 17-083 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.