My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC.
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 5:24:44 PM
Creation date
7/17/2018 3:57:34 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC.
Contract #
A-2018-160-03
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
9/1/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t % <br />Sub -Task 1.7 Ary MUM — Underground)ng existing powedlnes Is possible If SCE accepts proposed switch locations, As dosoribed in the <br />�! <br />approach coordination with SCE would occur in two phases, Our current scope Is limited to street design. HZ will coordinate with third party <br />purveyors to find feasible alignments for dry utility, The proposed alignment would be Incorporated Into a conflict exhibit for evaluation. The <br />' <br />coordination is limited to the street improvement design period. <br />Sub-TaskAo spealBaallons—HZ will utilize City of Santa Ana standard bid specifications and/or the latest edition of the Standard Specifications <br />for Public Works Construction and editthem to fit the project requirements.) <br />Sub-7ask1 R Estimates of Probable Cost— HZ will prepare estimates of probable cost for the proposed improvements. <br />Sub-Taskl.19MA&PIons-HZ will prepare utilq plans this Includes an option for potholes to Investigate existing utility size and depth. Further <br />' <br />investigation will be necessary where record Information is unreliable and thought to cause a conflict with proposed Improvements. Existing <br />manholes will be dipped where possible to verify inverts and pipe size. Notices will be sent to impacted utility companies and everyeffort will be <br />�) <br />made to resolve conflicts prior to 60% submittal, <br />' <br />Sub-TaskMl Afsposlgon Plans—Removals are limited to infrastructure within project limits <br />Sob -1001.12 Water Well Rebabigleft Plop <br />t`) <br />Sob-raskl.I3 AHsfte lmprovemantPlans- Excluded <br />) <br />Option A: Typical Street Improvement set will include: Option 6: Typical Street Improvement set will Include - <br />1. Title Shoot 1. Title Shoot 9, Signing & Striping Details <br />�) ' <br />2. Index Sheat 2, Index Shmt 10, Sound Wall Plan • (3 sheets) <br />S. Disposition Plan 3, DlspoottlanPlan 11, Soured Wall Mile <br />O <br />4, Street Plans (It Required) 4, S010atimpravementPlens(5 12. StreatRghtPiao43sheets <br />�] <br />5. Utilitylmprovamost Plans (2 sheets) $heets) double steoked) <br />6. WaterWall Rehabilitation Plan 5. Details&Typical Gross 13, StreeUfghtOSFails <br />() <br />7, Details and Typical Cross Sections Sections 14, landscape & Irrigation Plan (S <br />('.) <br />6. $term Drain Improvements—(2 sheate-double <br />(J <br />shoots) 15. Landscape & Irrigation Details <br />1 DrajgageDetails <br />(,1 <br />8. Signing & Striping Pla as (3 <br />( ) <br />sieots'dduble stacked) <br />(..) <br />i_ <br />TASK K; Construction Adminlslratlon Services (Op0onal) <br />• <br />Sob -Task K,1 Aid Sopport— HZ will be available to attend the pre-bid meeting. Our team will review contractor's RFis if requested by the City <br />(•) <br />during the bidding phase, <br />Sub -Task A:2 Consirnsgon Sltppert— HZ will participate in construction meetings if necessary. HZ will review submittals and shop drawings <br />j required to support the construction contract. Reviews will be completedwithin 10 working days of receipt Contractor change orders will be <br />U <br />S completed within two working days of receipt HZ will be available as requosted by the City to resolve discrepancies in Contract documents. HZ <br />{ ,) <br />will furnish necessary revisions to documents due to errata and/or omission at no cost, <br />Sub ILS Record Arswlrrgs The HZ <br />-Task — contractor shall provide as-buiK redlines, will revise approved plans per conttactor comments to <br />produce record drawings, <br />) <br />Sub -Task MProject Close -got- HZ will assist In the development of the project punch list as related to the construction package prepared by <br />our team. <br />y <br />\J <br />L� <br />C. <br />HUff T—A Clty of Soota Ana Civil Engineering Services; RFP 17-083 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.