Eduoatlon
<br />88,.0Ivll Enginogring, University
<br />ofOaffornia, Irvine
<br />ClertifioatlonJLloense
<br />Profeeaional Enginoor: OA, UT
<br />Areas of Expertise
<br />• Wall EqulppingPlgnningand
<br />.
<br />Design
<br />• Pipeline Planningand Design
<br />• Project Management
<br />• Program Management
<br />• Projeotoollvery
<br />` Groundwater Supply
<br />• Pump Station Planning and
<br />Design
<br />+ Roservolr8torago Planning
<br />and Design
<br />Drinking Water
<br />EXperlenoe
<br />23 Yotal ,cars
<br />+ tyoarwithHaxen
<br />Professional Aotivitiss
<br />AW WA, ASOE, ANITA
<br />OA•NV AWWA,
<br />OA Water Reuse Assoo.
<br />Cindy Miller, PE
<br />Water/Wastewater Team Lead
<br />Us. griller has extensive experience in the
<br />planning; design an d. e on s tru ction ofivater s upp ly,
<br />treatment, storage and conveyance facilities,
<br />liar assignments have Included providing Program Managementservices
<br />for $rSo milllongmundwatet•supplyproject, which includes pipelines,
<br />wells, pump stations, and an advanced treatment system for R:D, con-
<br />centrate reduction; ProjectManager for preliminary and final design of
<br />a M MGDmicrofiltration 'treatment facility, and project Manager for a
<br />io MODR,O./Ion Exchange groundwater treatment plant, Ms. Miller has
<br />also led numerous water storage and conveyance Infrastructure projeets,
<br />Including design of over 100 miles of Ductile Iron, CMUC steel, PVC,
<br />and HI)PSpipellne, design of steel, pre -stressed concrete,.and cast-in-
<br />plaee concrete storage -reservoirs, up to to million gallons, and numerous
<br />pump station facilities. She has led feasibility and planning studies,
<br />developed tnatmentprocess evaluations and life -cycle cost evaluations,
<br />participated In value engineering studies and operations evaluations,
<br />She has developed detailed designs of many systems imd provided con-
<br />struction and startup services, Shc.has experlence with different project
<br />delivery methods including: desigurbid-build, design -build and de-
<br />sign -build -operate -finance,
<br />41ty of Santa Ana well 29 Improvements Alternatives Analysis,
<br />SantaAna,.aA
<br />Principal in Charge. The City of Santa Ana owns and operates Well29,
<br />located atthe southeastcorner offlower Street and First Street, adjacent
<br />to City awned tennis courts. Well29 pumps directly to an existing $ MG
<br />reservoir. The existing well site includes the well :read and discharge
<br />pipingassembiy, controlequlptneat, achlorination systemina building,
<br />and anSCS transformer. An alternatives analysis was conducted to rec-
<br />ommend upgrades at the site Including site improvements, structural,
<br />mechanical, and electrical upgrades. Highlights of the study Include
<br />developing three (3) alternatives for the Improved site, providing 3D
<br />renderings for each site alternative, and developing a preliminary opin-
<br />ton of probable cost for the design and construction of each alternative
<br />discussed, The City Ismoving forward with Implementing the recom-
<br />mended alternative from this analysis,
<br />t
<br />
|