My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN (3)
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY-HORN (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 11:16:36 AM
Creation date
7/20/2018 12:19:21 PM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN
Contract #
A-2018-159-01
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
4/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Education <br />Tori Yokoyama, PE <br />Water/Wastewater Teohnioal Lead <br />1VIr, Yokoyanla is experienced in project <br />management and design ofwater and sewer <br />pipelines in city. streets. His background <br />includes both the design of new facilities, as well <br />as rehabilitation ofaging existing facilities. <br />State PolykeaFtnia;Qpivare�ty, uan <br />Statevn8naihnic, S,Oalllty,$ <br />OityofSantaAnaWell 90Improvements Alternatives ,Analysis, <br />Luis Oblspo <br />Santa Ana, OA <br />Project Engineer, The City of Santa Alta owns and operates Well 29, to- <br />O:ertiNoation/Lleense <br />catedatthe southeast corner ofFlower Street and MrstStreet, adjacent <br />Proresalonal Engineer; OA, Guam <br />to City owned tennis courts. Wall29 pumps directly to an existing.8 MG <br />reservoir. Tito existing well site Includes the well head and discharge <br />Areas of Expertise <br />pipiugassembly, control equipment, achlorination systeminabuilding, <br />• plpellnes <br />and an SCE transformer. An alternatives analysis was conducted to rec- <br />• Pump Stations <br />otnmend upgrades at the site Including site improvements, structural, <br />Reeervolrs <br />mechanical, and electrical upgrades. Highlights of the study include <br />Master Plane <br />developing three (3) alternatives for the Improved site, providing 3i) <br />e HydraulloModeling <br />renderings for each site alternative, and developing apreliminaryopin- <br />ion of probable costfor the design and construction of each alternative <br />Experience <br />discussed. The City is moving forward with implementing the recom- <br />• 16 total years <br />mended alternative from this analysis, <br />• tyoarwith Hazen <br />West Grove Valley Pipelines, Riverview Pipelines, Santa Ana, OA <br />Professional Activities <br />Project Manager, Two projects with the City of Santa Ana included a <br />OA-NV AWWA <br />total of over 17,000 LF of water pipeline design ranging 1n size from <br />OOWA <br />8-Inch to 12-Inch diameter. The City Is actively replacing aging and un- <br />As06 <br />dersized water mains throughout their distribution system. The West <br />Grove Valley project include 9,e00 LF of pipeline replacement design. <br />The Riverview project Included 7,700 LF ofplpeiine replacement design. <br />Waterline Replacement Project, Yorba Linda Water District, Yorba <br />Linda, Anaheim, and Placentia, CA <br />Project Manager, provided preliminary and final design and construction <br />support services for the replacement of seven pipeline segments, .the <br />replacementofone pressure -reducing station, and the Installation ofone <br />newpressure-reducing station. The pipeline replacements required many <br />connections to existing pipelines, laterals, services, fire hydrants, and <br />other appurtenances. <br />
The URL can be used to link to this page
Your browser does not support the video tag.