Laserfiche WebLink
Steven Owns; PE <br />15,000 acre-ft per year, over 16 miles of12-Inch to 48-inch diameter pipe, a 2,65 MG welded steel reservoir, a <br />flow control,and recharge facility with 40,000 gpin capacity and up to285 psipressure drop, a pump station <br />sized for 2s,000 gpm with pumps.lnstalled, to provide ts,oao gpm,and four turnout flow control facilities for <br />delivering the water to member agencies, <br />BelifipwerHigh Capacity Well, Oity ofBeliflower, 8911flower, OA <br />Project Manager. Preparedapreliminarydesignreportandprovidedfinalengineeringdesignandconstrue- <br />tion management and Inspection services for the well drilling and equipping of the city's new high -capacity <br />groundwater well. The well Is designed to produce 3,500 gallons per minute of high -quality groundwater to <br />replace alarge portion of the city's water supplies. Electrical design services included amotor control center, <br />a variable -frequency drive.for the well pump, Interior and exterior lighting, an automatic transfer switch; and <br />an emergency dlesel-ftclad generator. Control design included preparation of process and instrumentation <br />diagrams and specification of control components to provide consistency with control components installed <br />In existing city facilities. Provided engineering support duringtesthigand start -tip of the well. <br />Wells 21 and 22 Wellhead Facilities and Pipelines, Irvine Ranch Water Dlatrlot, Tustin, CIA <br />Task Manager. Task manager responsibleforthe design of the wellbead facilities untreated water pipeline. <br />Dellverables Included plans, specifications and engineers estimates of probable construction costs for each <br />the wellhead facilities and all pipelines. Well 21 and Well 22, with capacities of woo gpm and 1,600 gpm re- <br />spectively, are submersible turbine pump / motor assemblies, installed within vaulty, and one well Is equipped <br />with a bladder -type surge tank, Project included 7,000 ft. of 24: inch steel untreated water pipeline, ls,000 <br />feet of 36-Inch steel product water pipeline and 1,700 LF of 10-inch HDPE brine concentrate pipeline. The <br />Pipelines requiredjack-and-bores to cross the OCTA Metrollnk tralntracks, an Orange County Flood Control <br />District channel, BNSF train tracks, a box culvert, And Peter's Canyon Channel, <br />Rehabilitation of Oollose Avenue Pump Station, Orange County Sanitation District, O.osta Mesa, OA <br />Engineer. Provided engineering services to Orange County Sanitation District for rehabilitation of College <br />Avenue Sewage Pump Station. Provided engineering and construction support services for the rehabilitation <br />of the College Avenue Sewage Pump Station. The design included replacement ofpumpingequipment with new <br />dry -pit submersible pumps, structural rehabilitation of the wet -pit and dry-plt, a new ventilation system, a <br />new odor control system, anew dischargevalve vaultfor tntercomiecting dualforce mains, and a new concrete <br />block building for the electrical equipment and controls, The design Included replacement of pumping equip- <br />mentwith new submersible pumps and a new concrete block building to house the new electrical equipment <br />and controls. <br />Reconstruction of the Los Alamitos Pump Station and Retarding Basin, County of Orange, CA <br />Pump Station Technical Advisor, Prepared plans, specifications, and estimates for a new Boo cfs storm <br />water pump station with natural gas engine driven pumps to replace the existing Los Alamitos facility <br />for the County of Orange. Work Included final design for the pump station facility and retarding basin, <br />preparation of a value engineering report, final engineering report, hydrology and hydraulic routing, best <br />management practices for Improving water quality, Inspection and analysts of existing 2,400 lineal foot of <br />54-inch discharge piping, Phase I and II environmental assessments, geotechnical Investigation, CEQA, and. <br />permit processing, and coordination with agencies and homeowner associations. The pump station includes <br />fourvertical mixed flow pumps with a design capacity of 129 MGD cacti. Each pump is driven by a isoo hp <br />dual -fuel engine (natural gas and propane). Engine related components include a compressed air starting <br />system, primary and secondary iacket water cooling system, natural gas primary fuel system, and propane <br />