My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC
Clerk
>
Contracts / Agreements
>
S
>
STANTEC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 11:30:31 AM
Creation date
7/20/2018 12:23:28 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC
Contract #
A-2018-159-09
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
10/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage and Stormwater duality <br />Drainage Study and Water Quality Management Plans <br />(WQMP): Depending on project scope, we will prepare a <br />drainage study to provide hydrologic and hydraulic design <br />information to modify existing drainage structures In the <br />project area, When needed, we will also work with you to <br />prepare a Water Quality Management Plan and design <br />Appropriate Best Management Practices (SMP) to mitigate <br />stormwater quality and quantity runoff. <br />Storm Drain Plans., Based on the Drainage Study, we will <br />prepare storm drain plans for proposed and/or modified <br />drainage facilities. We anticipate the need to relocate <br />existing storm drain Inlets to the now curb alignment near <br />the intersecting street; therefore, this scope of services <br />Includes the reconstructed inlet and extended lateral. <br />Hydraulic information will be shown on the plans, <br />Stormwater Pollution Prevention Plan (SWPPP)INotice of <br />Intent(NQ/): Runoff during construction affects all <br />downstream water bodies. We will prepare a project specific <br />SWPPP and submit the NDI for construction to the RWQCB. <br />Landscape and Irrigation <br />We will provide landscape architecture services as required. <br />While we have a long history of deiivedng`attractive, <br />Innovative, and cost-effective solutions for streetscapes, <br />open space, parks, and trails; our expertise goes beyond <br />aesthetics and Includes technical solutions from porous <br />pavement systems, bioretention, blofiiters, and infiltration <br />basins. We will provide comprehensive services along the <br />parkways, including: <br />• Grading and planting design <br />• Irrigation design <br />• Vegetation control, protection, and management plans <br />• Environmental mitigation <br />• Landscape restoration <br />It is understood the medians will not be reconstructed; <br />however, we do anticipate landscape enhancements within <br />the medians to upgrade to low water use systems and match <br />the local character of the adjacent parkways, <br />Our approach combines a strong commitment to the most <br />advanced thinking and techniques in environmentally <br />sustainable design, construction, and long-term facilities <br />management. With our diverse set of in-house landscape <br />skills and expertise, we provide a comprehensive analysis of <br />the site and its context, finding the most effective and <br />creative sustainable development solutions. We create a <br />responsive fit between site opportunities, site conditions, and <br />project requirements to develop both economically viable <br />and environmentally responsive landscape architecture <br />design solutions, <br />Plans, Special Provisions, and Estimates <br />Utilizing data developed under various tasks previously <br />noted, we will develop PS&E documents. These documents <br />will provide the necessary detail for accurate survey and <br />minimal questions during construction. PS&E documents will <br />be subject to an internal review process and then submitted <br />for your review and comment at the 30%, 60%, and t00%a <br />precise geometric stages. Based on your feedback, we will <br />finalize the documents to prepare final documents for <br />construction. <br />A typical list of plan sheets for a roadway, trail, or site <br />Improvement project will include the following: <br />Typical cross sections and details <br />• Street plans and profiles <br />• Signing and striping <br />Pavement rehabilitation <br />• Storm drain and water quality BMPs <br />• landscape and Irrigation <br />Dry utility relocation <br />Traffic control <br />Notes, bid items, and quantifies <br />The list will Include approximately 15 sheets, including the <br />title sheet, Plans will be drawn at a scale of 1 °=20' With the <br />exception of Signing and Striping Plans, which may <br />drawn at 1"u10''; <br />Bid and Construction Support <br />Questions arise during the bid phase and in the field during <br />construction. We will act as your liaison from inception to <br />completion to make sure the finished product is true to the <br />original concept. We will help the construction team <br />complete the project with the high level of quality required <br />through our responsiveness and cooperativeness In <br />providing timely processing of submittals and answers to <br />design questions, as well as performing any necessary <br />investigations and field revisions, <br />Construction File: After completing construction, we will <br />prepare the Record Plans and compile electronic copies of <br />the project document and design files for your records.. <br />We recognize aesthetic and environmentally - <br />friendly designs create opportunities for <br />recreation, leisure, and education —increasing <br />value and enhancing user experience. <br />
The URL can be used to link to this page
Your browser does not support the video tag.