My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC
Clerk
>
Contracts / Agreements
>
S
>
STANTEC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 11:30:31 AM
Creation date
7/20/2018 12:23:28 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC
Contract #
A-2018-159-09
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
10/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sherry Weinmeier <br />PE, ENV SP, LEEP AP.Bp+C <br />Project Manager <br />Education <br />BS, Civil Engineering <br />Registrationst0ortifications <br />• Professional Engineerp41751., CA <br />Envisto I'm Sustainability Professional (ENV <br />SP), Institute for Sustainable Infrastructure <br />> LEEDAP Building Design + Construction, <br />U,S. Green Building Council <br />Why select <br />Proven PM--100s of successfully delivered <br />projects, Including 12+ task orders for 5 <br />on -call contracts in the past 5 years <br />Expansive concept -level through <br />PS&E expedanos <br />Successful local agency project experience, <br />Including with the City <br />Proven record of quality and delivery <br />Denotes projects completed with olher firms <br />rsu';�f <br />Sherry is a proven and highly respected leader in the A-E industry, <br />having delivered civil engineering and design services for public <br />agency clients throughout Southern California for more than 30 years, <br />Sherry's extensive expertise includes concopt•level infrastructure <br />design through final design services for large-scalo master <br />planned communities, a wide range of local public works facilities, <br />and award -winning multi -modal transportation facilities, including <br />the recently completed Redondo Beach Cycle Track, Sherry's <br />outatanding commitment to collaboration and communication, strong <br />understanding of details, and dedication to owners' goals has resulted <br />In her projects regularly being delivered on schedule and within <br />budget, <br />Santa Ana Cycle Track, Santa Ana, CA (Project Manager) <br />Sherry managed the preliminary design and precise goom rtrlcs for <br />Oils 2,4-mile separated bikeway in the City. She managed concept <br />refinements and precise alignment studies for the protected bike <br />lanes utilizing raised medians, landscape improvements, bulb -outs at <br />designated intersections, and traffic signal modifications, The design <br />will complete a one-way cycle track in each direction along Santa <br />Ana Boulevard, 5th Street, and 5th Street connecting the Santa Ana <br />Regional Transportation Center to the downtown civic center area, <br />The total project length is approximately 2 miles of one-way cycle <br />track and 04 miles of two-way cycle track. <br />CV Link, Coachella Valley; CA (Engineering Project Manager) <br />Sherry Is providing design oversight and project management services <br />for the civil and traffic engineering final PS&E design services for <br />the on -street segments of CV Link, CV Link is a 50-mile shared use <br />protected path connecting the Coachella Valley communities from <br />Palm Springs to Coachella, We are working closely with the client and <br />desert communities to design this world-oass facility, CV Link Is a <br />$100 million project with nearly all funding in place, <br />Redondo Beach Cycle Track, Redondo Beach, CA (Civil Load) <br />Sherry was the civil lead for providing full A-E services —from concept <br />through final PS&Es—for proposed bicycle -friendly, facilities along two <br />roadways, She led preparation of concept drawings and final plans <br />for the favored alternative, which includes a Class I separated cycle <br />track and City Welcome Park while increasing parking capacity within <br />the coastal zone, The project Included traffic analysis and simulation <br />of the road diet and roundabout, conceptual visualization, field <br />survey and aerial topography, civil design of the cycle track, drainage <br />facilities, landscape and site furnishings, and related signing and <br />striping plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.