Culver DrivolUnlversity Avenue Intersection and
<br />Widening, Irvine, CA (Project Engineer)
<br />Susan provided full A-E services for the City at this major
<br />arterial intersection to Improve the LOS and mitigate the
<br />future projected substandard LOS at the Culver Drive and
<br />University Drive Intersection. She is helping provide civil
<br />engineering, rlght-of�way services, landscape design, flood
<br />control, utility relocations, and environmental permitting
<br />through final PS&E.
<br />Redondo Beach Cycle Track, Redondo Beach, CA
<br />(Project Designer)
<br />Susan helped develop plans for proposed bicycle friendly
<br />facilities along two Important roadways within Redondo
<br />Beach's Marina district, She helped prepare concept
<br />drawings and final plans for the favored alternative, which
<br />includes a Class I separated cycle track and City Welcome
<br />Park while increasing parking capacity within the coastal
<br />zone. The project included traffic analysis and simulation
<br />of the road diet and roundabout, conceptual visualization,
<br />field survey and aerial topography, civil design of the cycle
<br />track, drainage facilities, landscape and site furnishings,
<br />and related signing and striping plans.
<br />John Wayne Airport Campus DrivelBristol Street
<br />Intersection improvements, Orange County, CA
<br />(Project Designer)
<br />Susan is providing design and engineering services, The
<br />project consists of widening southbound Campus Drive to
<br />provide an additional 600-foot-long, third right -turn tans
<br />onto northbound Bristol Street,
<br />Burbank Channel Bikeway Project, Burbank, CA
<br />(Project Engineer)
<br />We are providing full A-E and environmental services to
<br />the City of Burbank which completes an important bikeway
<br />link through design of a Class I bikeway and multi -use
<br />trail along the Burbank Channel, This bikeway will extend
<br />from the City's Metrolink station south toward the Los
<br />Angeles River Trail located just beyond the City limits, We
<br />have provided presentations at council meetings, met with
<br />the community In open gatherings and one,on-one with
<br />the City, and also helped develop a community survey to
<br />gather Input from all Interested members. Our concept
<br />designs looked closely at each of their concerns and
<br />provided detailed cost estimates of the proposed project
<br />alternatives. One of the interesting project challenges is
<br />the conversion of an abandoned rail road spur line bridge
<br />to be used for the bikeway with added protective railing.
<br />We are also providing at -grade crossings at four locations
<br />and linkages to dead-end streets at four locations.
<br />Bayview Drive Improvements, County of Orange, CA
<br />(Project Engineer)
<br />Susan provided professional engineering services for the
<br />street improvements including preparation of a Focused
<br />Study Report. Her services Included an alternatives
<br />analysis to alleviate flooding and ponding issues, as well
<br />as avoid utility conflicts during the construction of a new
<br />storm drain and street improvements, dght�of-way studies,
<br />detailed hydrology and hydraulics computations, and
<br />preparation of the Environmental Analysis Checklist,
<br />Moulton Parkway Smart Street Widening
<br />Improvements, El Toro Road to Santa Marla Avenue,
<br />Laguna Woods, California (Project Engineer)
<br />Susan served as project engineer for civil engineering
<br />and design services for Moulton Parkway Smart Street
<br />Improvements Including Class 2 Bikeway from 400 feet
<br />north of El Toro Road to 600 feet north of Santa Maria
<br />Avenue, Improvements included raised median islands,
<br />median and parkway landscaping, concrete bus pads,
<br />street lights, modification of existing traffic signals, signing
<br />and striping, soli nail wall, retaining walls, wrought Iron
<br />fencing, and adjusting and relocation of utilities. Stantec'a
<br />services included preparing PS&E documents for the
<br />proposed improvements. Close coordination with the
<br />Orange County Public Works and other consultants was
<br />needed to achieve the goals of the project
<br />On -Call Street Improvements in Lake Forest's Light
<br />industrial Area, Lake Forest, CA (Project Engineer)
<br />Susan provided engineering for Front Street, Orange
<br />Avenue, and Whisler Drive —all located in a light
<br />Industrial area —to improve roadway surface, drainage,
<br />and pedestrian access, The scope of work included
<br />preparation of numerous alternatives to design
<br />improvements with the least of right-of-way impact, She
<br />provided a design solution to an existing drainage sump.,.
<br />with no stone drain outlet by mcdifying the street oross
<br />section to provide positive surface drainage towards an
<br />existing storm drain system.
<br />Kline Drive Roadway and Storm Drain Improvements,
<br />County of Orange and City of Newport Beach, CA
<br />(Project Engineer)
<br />Susan developed various alternatives to alleviate storm
<br />drain Issues, prepared detailed hydrology and hydraulics
<br />computations, and prepared the County of Orange
<br />Environmental Analysis Checklist.
<br />I�
<br />1.1
<br />Denotes projects completedwrtitotherfirms L. _J