Laserfiche WebLink
Culver DrivolUnlversity Avenue Intersection and <br />Widening, Irvine, CA (Project Engineer) <br />Susan provided full A-E services for the City at this major <br />arterial intersection to Improve the LOS and mitigate the <br />future projected substandard LOS at the Culver Drive and <br />University Drive Intersection. She is helping provide civil <br />engineering, rlght-of�way services, landscape design, flood <br />control, utility relocations, and environmental permitting <br />through final PS&E. <br />Redondo Beach Cycle Track, Redondo Beach, CA <br />(Project Designer) <br />Susan helped develop plans for proposed bicycle friendly <br />facilities along two Important roadways within Redondo <br />Beach's Marina district, She helped prepare concept <br />drawings and final plans for the favored alternative, which <br />includes a Class I separated cycle track and City Welcome <br />Park while increasing parking capacity within the coastal <br />zone. The project included traffic analysis and simulation <br />of the road diet and roundabout, conceptual visualization, <br />field survey and aerial topography, civil design of the cycle <br />track, drainage facilities, landscape and site furnishings, <br />and related signing and striping plans. <br />John Wayne Airport Campus DrivelBristol Street <br />Intersection improvements, Orange County, CA <br />(Project Designer) <br />Susan is providing design and engineering services, The <br />project consists of widening southbound Campus Drive to <br />provide an additional 600-foot-long, third right -turn tans <br />onto northbound Bristol Street, <br />Burbank Channel Bikeway Project, Burbank, CA <br />(Project Engineer) <br />We are providing full A-E and environmental services to <br />the City of Burbank which completes an important bikeway <br />link through design of a Class I bikeway and multi -use <br />trail along the Burbank Channel, This bikeway will extend <br />from the City's Metrolink station south toward the Los <br />Angeles River Trail located just beyond the City limits, We <br />have provided presentations at council meetings, met with <br />the community In open gatherings and one,on-one with <br />the City, and also helped develop a community survey to <br />gather Input from all Interested members. Our concept <br />designs looked closely at each of their concerns and <br />provided detailed cost estimates of the proposed project <br />alternatives. One of the interesting project challenges is <br />the conversion of an abandoned rail road spur line bridge <br />to be used for the bikeway with added protective railing. <br />We are also providing at -grade crossings at four locations <br />and linkages to dead-end streets at four locations. <br />Bayview Drive Improvements, County of Orange, CA <br />(Project Engineer) <br />Susan provided professional engineering services for the <br />street improvements including preparation of a Focused <br />Study Report. Her services Included an alternatives <br />analysis to alleviate flooding and ponding issues, as well <br />as avoid utility conflicts during the construction of a new <br />storm drain and street improvements, dght�of-way studies, <br />detailed hydrology and hydraulics computations, and <br />preparation of the Environmental Analysis Checklist, <br />Moulton Parkway Smart Street Widening <br />Improvements, El Toro Road to Santa Marla Avenue, <br />Laguna Woods, California (Project Engineer) <br />Susan served as project engineer for civil engineering <br />and design services for Moulton Parkway Smart Street <br />Improvements Including Class 2 Bikeway from 400 feet <br />north of El Toro Road to 600 feet north of Santa Maria <br />Avenue, Improvements included raised median islands, <br />median and parkway landscaping, concrete bus pads, <br />street lights, modification of existing traffic signals, signing <br />and striping, soli nail wall, retaining walls, wrought Iron <br />fencing, and adjusting and relocation of utilities. Stantec'a <br />services included preparing PS&E documents for the <br />proposed improvements. Close coordination with the <br />Orange County Public Works and other consultants was <br />needed to achieve the goals of the project <br />On -Call Street Improvements in Lake Forest's Light <br />industrial Area, Lake Forest, CA (Project Engineer) <br />Susan provided engineering for Front Street, Orange <br />Avenue, and Whisler Drive —all located in a light <br />Industrial area —to improve roadway surface, drainage, <br />and pedestrian access, The scope of work included <br />preparation of numerous alternatives to design <br />improvements with the least of right-of-way impact, She <br />provided a design solution to an existing drainage sump.,. <br />with no stone drain outlet by mcdifying the street oross <br />section to provide positive surface drainage towards an <br />existing storm drain system. <br />Kline Drive Roadway and Storm Drain Improvements, <br />County of Orange and City of Newport Beach, CA <br />(Project Engineer) <br />Susan developed various alternatives to alleviate storm <br />drain Issues, prepared detailed hydrology and hydraulics <br />computations, and prepared the County of Orange <br />Environmental Analysis Checklist. <br />I� <br />1.1 <br />Denotes projects completedwrtitotherfirms L. _J <br />ttf:F.Q:`z, <br />