My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC
Clerk
>
Contracts / Agreements
>
S
>
STANTEC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 11:30:31 AM
Creation date
7/20/2018 12:23:28 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC
Contract #
A-2018-159-09
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
10/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Vijay Pampara <br />EIT <br />Civil Design <br />Education <br />MS and BS, Civil Engineering <br />Registratlons]Certfflcations <br />Engineer-In-Tralning#141291, CA <br />Why select <br />PS&E preparation experience <br />City of Santa Ana project experience <br />Well versed In and adheres to local city, <br />state, and Federal agency processes and <br />guidelines <br />Denotes projects completed Witt, Other firms <br />Vijay provides engineering and design services for public and private <br />infrastructure projects throughout orange County, including the City <br />of Santa Ana. He is experienced in all design stages, including PS&E <br />package preparation. Additionally, Vijay has worked on numerous <br />Caltrans and Southern California municipal projects, including <br />Interchange roconfiguration, roadway improvement, cost estimating, <br />and hydrology/hydraulles design, His strengths also include AutoCad <br />Civil 31), InRoads, and Micro Station design tools, <br />Santa Ana Cycle Track, Santa Ana, CA (Design Engineer) <br />Vijay provided civil engineering design services for this 2.4-mile <br />separated bikaway within the City of Santa Ana. We provided concept <br />refinements and precise alignment studies for the protected bike <br />lanes utilizing raised medians, landscape improvements, bulb -outs at <br />designated Intersections, and traffic signal modifications, The design <br />will complete a one-way cycle track in each direction along Sania Ana <br />Boulevard, 5th and 0th Streets connecting the Santa Ana Regional <br />Transportation Center to the down town civic center area. The total <br />project length Is approximately 2 miles of one-way cycle track and 0.4 <br />miles of two-way cycle track, <br />CV Link, Coachella Valley, CA (Design Engineer) <br />Vijay Is providing civil and traffic engineering final PS&E design <br />services for the on -street sagmonts of CV Link, CV Link is a 50- <br />mile shared use protected path connecting the Coachella Valley <br />communitiesfrom Palm Springs to Coachella, We are working closely <br />with the client and desert communities to design this world -class <br />facility, CV Link is a $100 million project with nearly all funding in <br />place, <br />Maine Avenue Complete Streets, Baldwin Park, CA <br />(Design Engineer) <br />Vijay Is designing ADA curb ramps, re -designing commercial and <br />residential driveways forADA compliance bulb -outs, and designing <br />the roundabout. A road diet is proposed for the Maine Avenue <br />corridor, which will modify the four -lane roadway to provide a three. <br />lane roadway, providing one through lane In each direction and a <br />continuous median or center left -turn lane throughout. <br />
The URL can be used to link to this page
Your browser does not support the video tag.