My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5
Clerk
>
Contracts / Agreements
>
N
>
NV5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 10:48:54 AM
Creation date
7/24/2018 10:46:37 AM
Metadata
Fields
Template:
Contracts
Company Name
NV5
Contract #
A-2018-160-04
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
5/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT UNDERSTANDING <br />WATER RESOURCES (OPTION A) <br />We understand that the City Is seeking the design and <br />construction support services for the $onto Ana Water <br />Project. This project includes the rehabilitation of an <br />existing water well approximately 30 years old, and the <br />design of 1500•feotof 12•indh PVC water main and the <br />construction of 600•fast of 15-inoh sewer main on an <br />arterial street. The City would like for the consultant to <br />provide feedback regarding the material of choice for the <br />sewer main Improvements. Also, the City would like to <br />connect this well to the water system, as of right now it <br />does connect to an existing ohsite reservoir. This well is <br />a sand producer, end currently the capacity has dropped <br />by approximately 35% of fie maximum yield of 2000 GPM. <br />The depth of the well is approximately 1100-feet; it has <br />a vertical turbine pump with a 250hp motor, In addition, <br />the screens are made of mild steel. No video or any other <br />preventive maintenance has been done In the past 15 <br />years. <br />Well Rehabilitation <br />Our proposed scope of work is divided into a two-phase <br />approach. Phase I will Include reconnaissance of the <br />well to characterize the current condition and develop <br />a rehabilitation plan, phase 11 will be to perform the <br />rehabilitation necessary to restore the well to proper <br />working order. <br />Since the rehabilitated well is to be connected to <br />the dfstributien•system, NV5's design will include <br />considerations for the following required appurtenances: <br />• Flow control valve <br />• Pump to waste system <br />• Chlorination <br />. SCADA connection <br />It Is assumed that the well will be re -equipped with a <br />new pump, motor, MCC, and appurtenances. <br />Water and Sewer Main <br />Both the water main and sewer extensions will be <br />designed according to City standards. NV5 would typically <br />specify high-strongth VCP for the proposed 154rich sewer. <br />PROJECT UNDERSTANDING <br />GENERAL ENGINEERING (OPTION B) <br />We understand that the City Is seeking the design and <br />construction support services for the Mile One Street <br />Project. This project will follow a complete street concept. <br />The length of the project is approximately 1,000 linear <br />feet. Both intersections at the outer limits of the project <br />have been rnodited'as part of the complete street project <br />under previous phase, The proposed project consists of <br />street rehobil:itstlon, bicycle lone, sidewalk, and parkway <br />Improvements, The sidewalks are 5 feet wide and the <br />parkways are 4 feet wide. The project also Includes <br />widening of the east side of the street to accommodate <br />a new bicycle lane. The right of way Is approximately 12 <br />feet wide with three traffic lanes in sach,direction with a <br />14 foot wide median. The required right of way liar, been <br />acquired by the City <br />GENERALAPPROACH <br />Work Breakdown Structure <br />Upon issuance of a notice to proceed, our project manager <br />will meet with team members to review the requirements, <br />prepare a Work Breakdown Structure and make team <br />assignments for maximum eMclenoy of resources. The <br />detailed WB5 will describe all of the work tasks necessary <br />to complete the project. A master project schedule wl.if <br />be prepared following the WBS to show the relationship <br />between tasks, the expected start date and duration <br />for each item. This schedule will serve as a guide to <br />conducting and monitoring the progress of the work and <br />to ensure projects are completed on tirne and within <br />budget To ensure accurate monitoring and tracking of <br />documents, revisions acid progress, a document tracking <br />and control system will be developed. We will meet <br />with City project representatives regularly and maintain <br />constant communication to ansure successful and timely <br />delivery of the project. Meeting minutes will be distributed <br />within one week of the meeting Identifying actions, items, <br />assignments and due dates. <br />Cost Control <br />We are able to continually review and evaluate a project's <br />cost through all project phases to enable informed and <br />
The URL can be used to link to this page
Your browser does not support the video tag.