A) Research - Perform research of records Including <br />utilities, other agency records as necessary to secure <br />information required to Identify, locate, and accurately <br />layout ell existing utilities, Improvements, easements, <br />and rights -of -way within project limits that may interfere <br />with the proposed improvements. The information to be <br />researched will be, as a minimum, the following: <br />1, Review existing utility and street record drawing <br />plans; <br />2. perform utility Investigation/utilitycoordination <br />and provide utility relocation recommendadans, if <br />necessary, <br />3. Perform field investigation and measurement to <br />assess existing site conditions, <br />4, Provide a copy of ail utility notifications and <br />responses prior to first progress payment request, <br />B) Surveying - Perform a topographic survey along the <br />pipe alignment to include the following! <br />I. Provide topographic survey using City standard North <br />American Datum 1983, <br />2. Provide one (1)-foot contours based on City of Santa <br />Ana vertical datum (NC,VD B8). <br />3. Provide spot elevations at critical locations along the <br />alignment to verify vertical control, check existing <br />utilities, such as sewer manholes and storm drain <br />junction structures, <br />4. Survey flow -line elevations Of existing underground <br />sewer and atorm drain utilities crossing.ptoposed <br />pipeline. <br />5. Provide spot elevations at all locations where existing <br />utilities are potholed. <br />6. Show surface features and visible Indications <br />Of axlsting utilities to Include curls end gutters, <br />sidewalks, and other elements relevant to prepare a <br />comprehensive topographic map suitable for pipeline <br />design and construction, <br />7. Establish street centerlines, right-of-way lines, and <br />easements from available record Information. <br />8, Provide the hasis-of-bearing and benchmark <br />Information used for the survey and necessary for <br />construction. <br />C) Utility Locating/Potholing - Perform necessary <br />research to Identify all existing utilities and potential <br />conflicts. Pothole existing utilities to verify depth and <br />location (assume 16 potholes). Measure and identify in the <br />potholing report the depth. Of pavement and base material <br />at each location potholed. Provide all required traffic <br />control end surface repair necessary for potholing work. <br />TASK 3 - PRELIMINARY DESIGN <br />Develop a preliminary design of the project: site to <br />review with city staff, An approximate 30% design level <br />will constitute a Preliminary Design for this project, <br />Preliminary design will include, but not limited to the <br />following. <br />• Existing utilities <br />• Existing pavemeht, curb, gutter, sidewalk, <br />driveways <br />+ Permitting requirements <br />Traffic Impacts <br />Easement requirements <br />• Proposed pipe alignment and Connections <br />• Proposed) pavement, curb, gutter, sidewalk, driveways <br />• Based on survey results and City Input NV5 will <br />design proposed water and sewer improvements <br />• Preliminary construction cost estimate <br />• Schedule <br />TASK 4 - FINAL ENGINEERING AND PREPARATION <br />OF CONSTRUCTION CONTRACT DOCUMENTS <br />Final Engineering will Inolude detahed engineering <br />calculations, design, construction plans, and engineer's <br />construction cost estimate for the project that will enable <br />the city to advertise and award the construction contract <br />for the project. components of this task Include; <br />A) Plan and Project p0ouments preparations (75°%, <br />100%, and Final) - NV5 will submit one (1) set of 24-inch <br />x 36•inch and two (2) sets of 11-inch x 17,Inch plans on <br />bond paper for each submittal, Paper submittals will he <br />WOOmpanjed by a CD with scanned images (PDF ff es) of <br />submittals. The final submittal will include one (1) set of <br />24-Inch x 36-Inch odgmal signed/sealed plans on bond <br />Paper, one (1) Got of bid form, opinion of construction cost, <br />and electronic files as described herein, <br />City will review and return 60% plans with Comments <br />pertain ing to required Improvements for the project. Plans <br />and project documents submitted as 100%will incorporate <br />all comments, NV5 will provide a digital copy of the <br />approved project plans in Mlcrostation V81 and PDF to the <br />City on a compact disc. <br />6) Engineer's Construction Cost opinion <br />1, Engineer's construction cost Opinion and quantity <br />takeoff (in MS Excel format) for use by the City to <br />advertise for bid, <br />2. Bid schedule/measurement and payment, <br />