My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5
Clerk
>
Contracts / Agreements
>
N
>
NV5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 10:48:54 AM
Creation date
7/24/2018 10:46:37 AM
Metadata
Fields
Template:
Contracts
Company Name
NV5
Contract #
A-2018-160-04
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
5/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3, Estimated biddinglconstruotlon schedule. <br />0) Preparation of Record documents - The construotion <br />contractor will provide to the City as built plans showing <br />changes made during the course of construction. NV5 will <br />prepare record drawings using as built drawings provided <br />by contractor and reviewed by construction Inspector, as <br />well as.additional inspector markups, and field notes, NV5 <br />will use City -provided record drawing stamp and will sign <br />,final record drawings, Submit the following: <br />1. One (1) set of 24-Inch x 36-inch Myer "Record <br />Drawings" <br />2, one (1) DVD with the record drawing files saved in <br />Microstation V8i and PDF formats <br />Anticipated plan sheets Include the following: <br />r " <br />2 G 1 General Notes, Construction Notes, <br />Legend <br />4.5 C-1 to 2 12•Inch PVC Plan & Profile. <br />7 0-4 Waterline Connection and <br />Standard Details <br />10-12 C.6 to s Well Site and Details <br />it- � t�� ' M�WieM <br />ra ".. <br />Optlonal Plans <br />NOW <br />, 16 r T•2 Traffic Control Plan <br />201111 ME RIM Rik <br />TASK 5 - BIDDING SERVICES <br />A) Bidding Phase Support -Assist the City in providing <br />clarification and prepare information to be used in <br />addenda as needed for ten (ZO) questions that may arise <br />during the bidding process. City will prepare and make <br />available to plan holders any required addenda, Attend the <br />pre -bid meeting, and assist the City with bid evaluations <br />and recommendation of bid award. <br />B) Conformed Plans - Prepare conformed plans for use in <br />constructing the project. The conformed plans will reflect <br />changes made during bidding, and will be noted as a <br />revision to the final design plans. <br />TASK 5 - ENGINEERING CONSTRUCTION SERVICES <br />NV5 will assist the City during the construction of the <br />project by performing the Items below, <br />A) Engineering Support - Assist the City with the following: <br />1, Provide profesaional engineering services to address <br />and respond to up to fifteen (15) Requests for <br />Information (RPI's) froin the contraotor, <br />2, Review up to twenty-five (25) shoo drawing and <br />materlals submittals, <br />3, Prepare supplementary sketches and details as <br />required to resolve field construction, problems that <br />may he encountered, <br />4. Review and provide recommendations regarding <br />proposed change orders, as needed, and <br />5. Attend pre-construotion meeting and up to one (1) <br />additlonai office or construction site meetings during <br />construction, <br />S) Minor Plan Revislons - Required mince' plan revisions <br />will be completed, <br />C) Preparation of Record Documents (As-Bpllts) - The <br />construction contract will require the Contractor to provide <br />to the City for review and approval one set of as -built; plans <br />showing the design changes made during the course <br />of construction. NV5 will prepare record drawings frorn <br />contractor and construction nspectoras-built drawing, <br />markups, and field notes, Submit the following: <br />1. One (1) set of 24-itn0h x 36•inoh rmylar "Record <br />Drawings" m,t <br />2. one. (1) eD (or DVD) with the record drawing files <br />saved in Microstation v81 and PDP' formats, <br />TASK 7 — OPTIONAL SERVICES <br />NV5 will provide separate line items in the cost proposal <br />for the "Optional Services". City may exclude or include <br />the optional services as part of the awarded contract at <br />City's discretion, The "Optional Services" will Include the <br />following activities: <br />" If required, Traffic Control Plans will be prepared by a <br />California Registered Traffic Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.