My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5
Clerk
>
Contracts / Agreements
>
N
>
NV5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 10:48:54 AM
Creation date
7/24/2018 10:46:37 AM
Metadata
Fields
Template:
Contracts
Company Name
NV5
Contract #
A-2018-160-04
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
5/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
addition, the plans will Include the sidewalk, and parkway <br />improvements, The bike lane, signing end striping plans <br />will be prepared at a 1" = 40' scale, These designs will <br />be supplemented by our field review of the project area <br />to visually confirm and assess tine project condition and <br />Identify specific improvements to be Included in the <br />project. These plans will then be used to evaluate the cost <br />of the project, and ascertain the Impact on the adjacent <br />Property owners other private improvements. <br />G. MEETINGS/SCHEDULES <br />We Will be avallable to attend team meetings, City Council <br />maeting$ and any other meetings with staff, agencies, and <br />the public as required, Utlllzing Microsoft Software Protect, <br />we will maintain updated project design schedules for use <br />by the City staff. <br />Final Design: Plans, Specifications <br />and Estimates <br />This task involves the completion of construction <br />documents in the form of final P5&E, <br />A..FINAL IMPROVEMENT PLANS <br />Upon City approval of the preliminary design, we will <br />Proceed with the preparation of final design piano, <br />specifications and Post estimate for submittal to the City <br />at the preliminary and final completion levels process, All <br />plans, reports, and documents will be submitted in the <br />format acceptable to the City. <br />The plans. will be prepared to conform to the general <br />requirements of the City with consideration for the needs <br />of the oontractor's construction operations. We will <br />deliver completed and approved construction drawings <br />on or ahead of approved schedules, Ali designs shall <br />be prepared and submitted in a mannerthat ensures a <br />complete design approved by the City. Where applicable, <br />the construction drawings will conform to the appropriate <br />spialcable standards sudh as City, county, state standard <br />Plans and specifications, APWA Standard Speolficaticns for <br />Public Works Construction "Greenbook," and Manual of <br />Traffic Uniform Control Devices, <br />The following drawings will be prepared for the project and <br />will be part of the plan set: <br />Title Sheet <br />Detail Sheet <br />f Street Widening and Rehabilitstlon Plans & Profiles <br />- Sidewalk and Parkway Improvement Plans. <br />• Bike Cane, Signing and Striping Plans <br />as <br />2 G2 General Notes, Construction Notes, <br />Legend <br />B-B SP-5 & Bike Lane, Signing, Striping <br />SP-6 &Markings Plans <br />B. SPECIFICATIONS <br />We will prepare complete project specifications, Irioluding <br />special provisions, that specifies traffic control, construction <br />notification and posting infemn6tlon per City's format and <br />direction. Copies of the Standard General Provisions and <br />Construction Contract Agreement shall be supplied by the <br />City tp Incorporate Into the construction documents, <br />C. QUANTITY AND 005T ESTIMATES <br />We will provide complete construction quantity and cost <br />estimates for the project. Estimates will be provided <br />at prellintnany and final completion submittals, and a <br />final estlrnate with the finalsubm,ittal. Exoei files will be <br />submitted with each submittal. Quantities will match the <br />Bid Proposal final quantities. <br />Bidding and Canstruction Services <br />We will provide support services during construction. <br />A. BIDDING SERVICES <br />Once the plans are approved and advertised, we will assist <br />City staff with bld/award activities, including responding <br />to bidder questions, We will be available to attend pre -bid <br />meetings and other meetings with staff as required. We <br />will also be available to clarify design -related Issues at all <br />times, <br />B. CONSTRUCTION SERVICES <br />We will be available to attend pre -construction meetings <br />and other meetings with staff, agencies, and the public <br />as required. We will provide responses to Requests for <br />Information. Vie will attend any required site meetings and <br />We will,lncorporate all redline comments prepared by the <br />Contractor and project inspector and provide the as -built <br />plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.