Laserfiche WebLink
PAUL M. FRISLIE, PE, IMSA <br />Senior Engineer <br />EDUCATION <br />• MBA,. Umvlt'51wof Phoenix, 2011 <br />• Bs, Civil Engineering, University of <br />California, hvin r, 2068 <br />REC,ISTRATIONS <br />• Civil Engineer (Pa): <br />. CA 072982, 2008 <br />• International Municipal Sri <br />Association (IMSA), <br />Traffic Shpol Level II,#0897189, <br />2012 <br />Traffic 5191'al Level 1, HAA97189, <br />dale <br />Signal Inspector Level 1, <br />051971&9, 2014 <br />work Zone Safety, =57189, <br />2010 <br />YEARS OF EXPERIENCE.17 <br />CORE COMPETENCIES <br />Trkffieghginednhg P, Operations <br />• ITS Planning, Design &Integration <br />. Traffic Signal Design <br />+ Construction Assistance <br />. Transit <br />AfFILIANON5 <br />• Orange County Trafficancinaering <br />Council(OCTEC) <br />iterise <br />Mr. Prlsllp a'arves as aS'enlor F,nginear 6f ICrods' Transportation Systems division and <br />has been with firm 51ncb lanuxry 2Up't, For over 17 years, Min FrISIle has been <br />Involved In several transportation and traffic engineering projects that Include both <br />signal design, Recently, he has served as the Project Manager farffiaRosecrans <br />Avenue Arterial Imprnvereant Projae4 Cypress Phi I through 31TS Projects; tire <br />Newport peach ITS PIlase S through 8 Projects, the Santa Monica At'MIS'Phase 4c <br />Project. He hii also been the Lead Design Engineer for the development of design <br />Plans for the Oxnard ITS Master Plan Design Project, Vermont Avenue Arterial <br />IMPTOVI nlent prefect; the Santa Monica ATIMS 0/41b Project, SR-710ITS Cosign <br />Project, Newport Beach ITS Phase 1, l; 3, 4 aIla 7 projects and the Fountain Valli <br />Oxnpd ITS Master Plan and the Rosecrans and yet most Adel it bnprovements <br />Project Experience <br />Harbor Boulevard Traffic Signal Synchronization (TSS) project - Orange <br />County Transportation Authority (OC IA) and City of Santa As CA <br />Mr, Prlslie served as QA/QC lead and Corlstructlon Manager to provide <br />construction support and perform all necessary Integration, <br />to plamentodon, and fine-tuning tasks for the Harbor RIGd TS5 project, <br />This project Involved Signal synchronization and equipment upgrade along <br />Harbor Blvd from Chapman Ave to Newport Blvd, spa%ng across the <br />Chios of Garden Grave, Santa Are, Fountain valley andcostaMesa, as <br />well as freeway on/off ramps at SR-22 and 1.405 with In Caltrans <br />iurisdletjon. In addition to gomeraddif PS&L palkages for equipment <br />upgrades, the project also Included the development, Implementation <br />and fine tuning of the AM, PM, midday, Off-peak and weekend traffic <br />signal coordinetion timing plane for all 46 intersections along the corrldor. <br />11a is will also provide Traffic Management Center (TMC) upgrades to the <br />cities of Costa Mesa and Santa Ana, Which -stems frOr -CIPSOC14l olit— -- -.. <br />Television (CCTV) licenses slid workstations to designing and rold cilia tile <br />C'ity's existing video wall system with power and more advanced <br />capabilities:. <br />Barranca Pkwy/Muinandn R1vd Regional Traffic Signal Synchroniee Lail <br />Project- Cities of itvine, lake Forest & Mission Viejo, CA <br />Mr. Frlshe Is the QA/QC Leader to provide traffiC(ITS design.improvelnants <br />and traffIn signal synchronization for 44intersections along a 13-mile <br />segment of Herat Ron Parkway/Mulrlands Blvd. The project involves design <br />of new fiber optic, cables (multi and single rrreae), COMU1 s, pull boxes, <br />Cabinets and controller Upgrade In City of Irvine; NOW condults, poll boxes, <br />twisted pair Interconnect, and wireless. radio in City of lake Forest; New <br />cabinets, pedestrian Signals and IOOP detection In City of Mission Viejo. fa <br />addition to the traffic signal inkastructure improvements, Iteds also <br />develops slope[ coordination plans for AM, noon, off-peak, PM, "affdr- <br />hours" and weekend for all project traffic Signals along the corridor. <br />Newport)Ralbaa Boulevard Regional Traffic Signal Synchronization <br />Project -Cities Of Costa Mesa and Newport Beach, CA <br />Mr, i'rislle serves as the QA/QC leader and Engineer of Record to OCTA to <br />provide turn -lacy [raffle/iTS Improvements and A offic signal synchronization <br />for 33 intersections along Newport/Balboa Boulevard corrldor from Bristol <br />Street In Costa Mesa to Main Street in Newport Beach, <br />innovating Through Infornnaticsran <br />