PAUL M. FRISLIE, PE, IMSA
<br />Senior Engineer
<br />EDUCATION
<br />• MBA,. Umvlt'51wof Phoenix, 2011
<br />• Bs, Civil Engineering, University of
<br />California, hvin r, 2068
<br />REC,ISTRATIONS
<br />• Civil Engineer (Pa):
<br />. CA 072982, 2008
<br />• International Municipal Sri
<br />Association (IMSA),
<br />Traffic Shpol Level II,#0897189,
<br />2012
<br />Traffic 5191'al Level 1, HAA97189,
<br />dale
<br />Signal Inspector Level 1,
<br />051971&9, 2014
<br />work Zone Safety, =57189,
<br />2010
<br />YEARS OF EXPERIENCE.17
<br />CORE COMPETENCIES
<br />Trkffieghginednhg P, Operations
<br />• ITS Planning, Design &Integration
<br />. Traffic Signal Design
<br />+ Construction Assistance
<br />. Transit
<br />AfFILIANON5
<br />• Orange County Trafficancinaering
<br />Council(OCTEC)
<br />iterise
<br />Mr. Prlsllp a'arves as aS'enlor F,nginear 6f ICrods' Transportation Systems division and
<br />has been with firm 51ncb lanuxry 2Up't, For over 17 years, Min FrISIle has been
<br />Involved In several transportation and traffic engineering projects that Include both
<br />signal design, Recently, he has served as the Project Manager farffiaRosecrans
<br />Avenue Arterial Imprnvereant Projae4 Cypress Phi I through 31TS Projects; tire
<br />Newport peach ITS PIlase S through 8 Projects, the Santa Monica At'MIS'Phase 4c
<br />Project. He hii also been the Lead Design Engineer for the development of design
<br />Plans for the Oxnard ITS Master Plan Design Project, Vermont Avenue Arterial
<br />IMPTOVI nlent prefect; the Santa Monica ATIMS 0/41b Project, SR-710ITS Cosign
<br />Project, Newport Beach ITS Phase 1, l; 3, 4 aIla 7 projects and the Fountain Valli
<br />Oxnpd ITS Master Plan and the Rosecrans and yet most Adel it bnprovements
<br />Project Experience
<br />Harbor Boulevard Traffic Signal Synchronization (TSS) project - Orange
<br />County Transportation Authority (OC IA) and City of Santa As CA
<br />Mr, Prlslie served as QA/QC lead and Corlstructlon Manager to provide
<br />construction support and perform all necessary Integration,
<br />to plamentodon, and fine-tuning tasks for the Harbor RIGd TS5 project,
<br />This project Involved Signal synchronization and equipment upgrade along
<br />Harbor Blvd from Chapman Ave to Newport Blvd, spa%ng across the
<br />Chios of Garden Grave, Santa Are, Fountain valley andcostaMesa, as
<br />well as freeway on/off ramps at SR-22 and 1.405 with In Caltrans
<br />iurisdletjon. In addition to gomeraddif PS&L palkages for equipment
<br />upgrades, the project also Included the development, Implementation
<br />and fine tuning of the AM, PM, midday, Off-peak and weekend traffic
<br />signal coordinetion timing plane for all 46 intersections along the corrldor.
<br />11a is will also provide Traffic Management Center (TMC) upgrades to the
<br />cities of Costa Mesa and Santa Ana, Which -stems frOr -CIPSOC14l olit— -- -..
<br />Television (CCTV) licenses slid workstations to designing and rold cilia tile
<br />C'ity's existing video wall system with power and more advanced
<br />capabilities:.
<br />Barranca Pkwy/Muinandn R1vd Regional Traffic Signal Synchroniee Lail
<br />Project- Cities of itvine, lake Forest & Mission Viejo, CA
<br />Mr. Frlshe Is the QA/QC Leader to provide traffiC(ITS design.improvelnants
<br />and traffIn signal synchronization for 44intersections along a 13-mile
<br />segment of Herat Ron Parkway/Mulrlands Blvd. The project involves design
<br />of new fiber optic, cables (multi and single rrreae), COMU1 s, pull boxes,
<br />Cabinets and controller Upgrade In City of Irvine; NOW condults, poll boxes,
<br />twisted pair Interconnect, and wireless. radio in City of lake Forest; New
<br />cabinets, pedestrian Signals and IOOP detection In City of Mission Viejo. fa
<br />addition to the traffic signal inkastructure improvements, Iteds also
<br />develops slope[ coordination plans for AM, noon, off-peak, PM, "affdr-
<br />hours" and weekend for all project traffic Signals along the corridor.
<br />Newport)Ralbaa Boulevard Regional Traffic Signal Synchronization
<br />Project -Cities Of Costa Mesa and Newport Beach, CA
<br />Mr, i'rislle serves as the QA/QC leader and Engineer of Record to OCTA to
<br />provide turn -lacy [raffle/iTS Improvements and A offic signal synchronization
<br />for 33 intersections along Newport/Balboa Boulevard corrldor from Bristol
<br />Street In Costa Mesa to Main Street in Newport Beach,
<br />innovating Through Infornnaticsran
<br />
|