Laserfiche WebLink
CONTACTINFO <br />KIKO ANTUNOVICH, PE <br />kiko.antunovicbOnv5,com <br />940.685.0477 <br />Project Engineer <br />.............. ..................... <br />EXPERIENCE <br />............ ....... ................ ....... .. ........ .......... — <br />Mr. AntLmovlch has more than three years of experience as 0 civil anglneer. His <br />8 Years <br />professional experience Includes Project engineer, design engineer and CAD designer. <br />EDUCATION <br />He is adopt at managing multiple municipal and agency projects, His qualifications <br />B.S. Civil Engineering <br />Include the ability to design and draft.corriplex water and wastewater projects Including <br />LICENSES <br />reservoirs, pump stations, water mains and sewer pipelines. <br />Civil i (CA) <br />Project Experience <br />No,97904 <br />--- ......... -1 <br />Posse Do Valencia Lift Station Rehabilitation <br />MOULTON NIGUEL WATER Dlsmv I LAGUNA HILLS, CA <br />Project Iii Mr, Antunovich 18 providing project engineering to develop plans <br />to replace aging pumps and motors to Increase system rell4dity, update and replace <br />aged electrical equipment, retrofit piping, rehabilitate facility for better ventilation, and <br />legal descriptions and plate. <br />Corryno and Slauson Area Main Replacements and Abandonment <br />GOLDEN STATE WATER COMPANY I CULVER CITY, CA <br />Project Engineer, Mr. Antunovloh Is acting as Project enghlear to develop plans and <br />specifications for the design of a potable water pipeline replacement Project located <br />In its Culver City Water, System, This project Includes replacing and abandoning 1,60o <br />LF of undersized and old 4-Inch, 64rch, and $0-Inch cast Iron water mains with 8-Inch <br />and 12-Inch PVC In the Public right of way (ROW). The purpose of this project Is to <br />improve waterquality, increase fire flows, reduce maintenance costs, and Improve <br />system reliability within the GSWC service area, This project is set to be constructed in <br />6 sequences. <br />Azusa Sewer Lift Station <br />CITY OF WEST COVINA I WEST COVINA. CA <br />Project Engineer. Mr. Anturovich is nalrig as project engineer to develop plans to <br />upgrade the exiting sewer Pumps and controls to comply with the Statewide General <br />Waste Discharge Requirements for Sanitary Sewer Systems; provide sufficient storage <br />capacity during emergency/power outages; provide backup power Systems; and SCADA <br />monitoring system to Pump data and status. <br />Alley Water Main Conversion, Liberty Court <br />LONG BEACH WATER DE13ARTMFNT I LONG BEACH, CA <br />Lead Designer, Mr. Antumovich designed and drafted the plans for the project. This <br />project included the relocation Of two waterlines and approxiinately 26 services within <br />two alleys to the adjacent streets, The Project consisted of the design of approximately <br />3750 LF of 8-inch DI pipe and 600' LF of 4-Inch DI pipe. The Project required extensive <br />field Investigation and coordination between the Long Beach Water Department <br />and property owners. The project construction was also split between the Water <br />Department constructing the pipe In theede, streets and the contractor constructing <br />the main within Atlantic Ave and reconnecting the service laterals, <br />