Laserfiche WebLink
CONTACTINFC <br />PETER SSALGADO, PE <br />peter.solgadoOnv5.com <br />949,585,0477 <br />Construction Manager <br />Mr Salgi do lies managed and delivered a <br />EXPERIENCE <br />vairiety of puiblic worksprojectsincluding street improvements; <br />p ernen#s, vortical construction <br />20 years <br />and tenant improvements; parks and landscaping improvements; and water, sower, <br />EDUCATION <br />and storm drain Improvements. Working with a variety of agencies, he is thoroughly <br />familiar with local, state, and federal procedures, <br />9.8, Civil Engineering <br />LICENSE$ <br />Project Experience <br />J <br />Civil Engineer (CA) <br />........... --- .......... ...................... ......................................,. <br />No, 631.59 <br />STREET IMPROVEMENTS <br />Bellflower Boulevard Pedestrian Enhancements <br />CITY OF BELLFLOWER I BELLFLOWER, CA <br />Construction Manager, Mr. Salgado managed this $1.2M street traffic signal and <br />parkways Improvements project, The scope of work included roadway reconstruction <br />and resurfacing; reconstruction of sidewalks (including decorative paving); driveways, <br />curbs, gutters, cross gutters, and ADA curb ramps; installation of traffic signals, <br />controller cabinets, and flashing beacon; landscaping and irrigation; and treffcstriping <br />and signage (including decorative crosswalks at the intersections). <br />FY 2013.2014, and FY 2015�2016 Annual Pavement Rehabilitation <br />CfrY MYORBA UNDA I YORBA LINDA, CA <br />Construction Managar, Mr. Salgado managed this $2.51M citywide street improvement <br />program. Specifically, the scope of work included reconstruction of sidewalks, <br />driveways, curb, gutter, and ADA curb ramps; roadway section repairs and resurfacing; <br />crack seal and slurry seal; and, traffic striping and signage. <br />Corporate Center Drive Street Lights Project <br />CITY OF POMONAI POMONA,CA <br />Construction Manager, Mr, Salgado managed this $250,000 street lights project <br />that included the removal and Installation of approximately 50 street lights in several <br />residential areas. <br />N V 5 <br />FY 2008 through 2016 Annual Citywide & Street Improvement Projects <br />CITY OF SANTA MONICA I SANTA MONICA, CA <br />Construction Manager. Mr. Salgado provided construction management, <br />Inspection, and public outreach for this annual citywide project. Work consisted of <br />pavement resurfacing of streets and parking lots (including slurry seal and crack <br />seal treatments); full pavement reconstruction; traffic signal modifications; and <br />construction of new sidewalks, driveways and ADA ramps. Keyservoes included all <br />facets of construction management and Inspection Including: utility and multiple <br />agency coordination; project budget and accounts tracking;. engineering plan and <br />specification review; traffic management and control; submittal, schedule, request <br />for Information (RFI), progress payment review and processing; field observation; <br />negotiating and processing change orders; document control; and project closeout, <br />which consisted of warranties, guarantees, recommending notices of completion and <br />the release of retention. Total construction cost varied between $1M and $3M. <br />