CONTACTINFO
<br />LUANNE BEAN, PE
<br />IVanno.bean@nv5.com
<br />949.585.0477
<br />Construction Manger
<br />.......... ...... ....................
<br />EXPERIENCE
<br />...... ............ . . .................. ....... ................. ..............
<br />Ms. Bean has more than 30 years of experience In the design and me nagement of
<br />30 years
<br />water and wastewater Projects, Her technical Skills Include Structural analysis and
<br />EDUCATION
<br />design, mechanical analysis, instrumentation and control, the preparation of plans,
<br />M.S. Civil Engineering
<br />specifications, and Post estimates as well as construction managernent She has
<br />B.S. Civil Engineering
<br />held various Positions with many public agencies Including the Long Bosch Water
<br />Department, Victor Wiley Wastewater Reclamation Authority, Indlo Water Authority,
<br />LICENSES
<br />Metropolitan Water District, and FEMA, Ms. Bean's technical experience includes large
<br />Civil Engineer (CA)
<br />scale public works projects for 000ltal Improvement programs Including construction
<br />No. 60129
<br />oversight, contract administration, document control, cost and schedule control,
<br />REGISTRATIONS
<br />cloallty control, structural analysis, and deslgn.
<br />T I
<br />FEMA OpS - I
<br />Project EXperlence
<br />HAZMATFirst Respondet/
<br />1 ............................ . ............... .__ . ...... ............ .............. .........
<br />Operations Level
<br />Alley Water Main Conversion, Phase II/Levels & Lemon
<br />DOT Offers of Bulk
<br />LONG BEACH WATER DEPARTMENT I LONG BEACH, CA
<br />OanstfuctlO" Mmnag0r/10813000r, Me. Bean completed full service Construction
<br />and Non,Bulk HAZMAT
<br />Packages
<br />Management and Inspection Services for the Phase 11 Alley Water Main Conversion
<br />project. The sqrvioes Included full time construction observation, materials testing,
<br />Nuclear Waste Safety
<br />review of Contractor's progress Payments, resolution of design Issues, shop drawing
<br />,for Workers
<br />review, RF1 resolution, change order management and resolution, meetings, public
<br />notifications and LEWD coordination for shutdowns for this project. Our Construction
<br />Management team resolved Public complaints and problems from the local businesses
<br />and residence before they become problems for City Hall and LEWD, Ms. Bean 0180
<br />oheolked NPDES and BMP measures, traffic control, arid safety measured during
<br />construction.
<br />J. W. Johnson Reservoir Facility Valve Replacements and Site
<br />Improvements Project
<br />LONG BEACH WATER DEPARTMENT I COMPTON, CA
<br />Resident Unginoer/Construotion. Manager. Ms, Bean was responsible for overseeing
<br />this project, which Involved replacement of four underground water main valves,
<br />Installation of five storm drain inlets, construction of a containnnerit cell for an Indoor
<br />above -ground chlorine tank, construction of a large concrete reinforced storage pad,
<br />trenching for the Installation of electrical oondolt, and re -paving of surface areas to
<br />allow for proper drainage,
<br />Group 12 CIPP Sewer Relining Program
<br />LONG QEACI I WATER DEPARTMENT I LONG 3EACH,,CA
<br />Construction Manager, Ms, Bean was the Construction Manager for the Long Beach
<br />Water Department's Group 12 CIPP sewer relining program, This Involved providing
<br />construction oversight and observation of LBWD's contractor to install almost 15,000
<br />of 1,11,ch, lo,inoh, and 11,inch curel-ln-Plac$ Sewer cleaning, Pro -lining video, lining,
<br />and post -lining video, Point repairs and manhole rehabilitations were also undertaken.
<br />Once the Installation of the CIPP began, Ms. Bean coordinated with the LSWD for
<br />V
<br />shutting off water services for the various residents and businesses along the sewer
<br />line routes, Once curing was completed, a post lining video was run, followed by re-
<br />installation of the laterals and top hat Installation on select laterals,
<br />
|