Laserfiche WebLink
CONTACTINFO <br />LUANNE BEAN, PE <br />IVanno.bean@nv5.com <br />949.585.0477 <br />Construction Manger <br />.......... ...... .................... <br />EXPERIENCE <br />...... ............ . . .................. ....... ................. .............. <br />Ms. Bean has more than 30 years of experience In the design and me nagement of <br />30 years <br />water and wastewater Projects, Her technical Skills Include Structural analysis and <br />EDUCATION <br />design, mechanical analysis, instrumentation and control, the preparation of plans, <br />M.S. Civil Engineering <br />specifications, and Post estimates as well as construction managernent She has <br />B.S. Civil Engineering <br />held various Positions with many public agencies Including the Long Bosch Water <br />Department, Victor Wiley Wastewater Reclamation Authority, Indlo Water Authority, <br />LICENSES <br />Metropolitan Water District, and FEMA, Ms. Bean's technical experience includes large <br />Civil Engineer (CA) <br />scale public works projects for 000ltal Improvement programs Including construction <br />No. 60129 <br />oversight, contract administration, document control, cost and schedule control, <br />REGISTRATIONS <br />cloallty control, structural analysis, and deslgn. <br />T I <br />FEMA OpS - I <br />Project EXperlence <br />HAZMATFirst Respondet/ <br />1­ ............................ . ............... .__ . ...... ............ .............. ­­ ......... <br />Operations Level <br />Alley Water Main Conversion, Phase II/Levels & Lemon <br />DOT Offers of Bulk <br />LONG BEACH WATER DEPARTMENT I LONG BEACH, CA <br />OanstfuctlO" Mmnag0r/10813000r, Me. Bean completed full service Construction <br />and Non,Bulk HAZMAT <br />Packages <br />Management and Inspection Services for the Phase 11 Alley Water Main Conversion <br />project. The sqrvioes Included full time construction observation, materials testing, <br />Nuclear Waste Safety <br />review of Contractor's progress Payments, resolution of design Issues, shop drawing <br />,for Workers <br />review, RF1 resolution, change order management and resolution, meetings, public <br />notifications and LEWD coordination for shutdowns for this project. Our Construction <br />Management team resolved Public complaints and problems from the local businesses <br />and residence before they become problems for City Hall and LEWD, Ms. Bean 0180 <br />oheolked NPDES and BMP measures, traffic control, arid safety measured during <br />construction. <br />J. W. Johnson Reservoir Facility Valve Replacements and Site <br />Improvements Project <br />LONG BEACH WATER DEPARTMENT I COMPTON, CA <br />Resident Unginoer/Construotion. Manager. Ms, Bean was responsible for overseeing <br />this project, which Involved replacement of four underground water main valves, <br />Installation of five storm drain inlets, construction of a containnnerit cell for an Indoor <br />above -ground chlorine tank, construction of a large concrete reinforced storage pad, <br />trenching for the Installation of electrical oondolt, and re -paving of surface areas to <br />allow for proper drainage, <br />Group 12 CIPP Sewer Relining Program <br />LONG QEACI I WATER DEPARTMENT I LONG 3EACH,,CA <br />Construction Manager, Ms, Bean was the Construction Manager for the Long Beach <br />Water Department's Group 12 CIPP sewer relining program, This Involved providing <br />construction oversight and observation of LBWD's contractor to install almost 15,000 <br />of 1,11,ch, lo,inoh, and 11,inch curel-ln-Plac$ Sewer cleaning, Pro -lining video, lining, <br />and post -lining video, Point repairs and manhole rehabilitations were also undertaken. <br />Once the Installation of the CIPP began, Ms. Bean coordinated with the LSWD for <br />V <br />shutting off water services for the various residents and businesses along the sewer <br />line routes, Once curing was completed, a post lining video was run, followed by re- <br />installation of the laterals and top hat Installation on select laterals, <br />