Laserfiche WebLink
CONTACT INFO <br />ROBERT H. DOSSo PE <br />robert.clossOnv5,com <br />949.585.0477 <br />Construction Manager <br />.... —, ................. 4.1;1-1111 <br />EXPERIENCE <br />........................... ..... ............... ............ ................................... ...................... <br />Mr. Doss has more than 35 Yeats of experience in civil engineering. As 8 results. <br />35 years <br />oriented project manager, Roberts strengths Include strong analytical skills, proven <br />EDUCATION <br />successful negotiating, consistency in quality performaijv6, demonstrated positive <br />KEA Management <br />pmpotive actions, composure while tinder pressure, consistency in delivering Superior <br />83, Civil Engineering <br />service tailored to Individual Customer needs, superb leadership traits, organizations) <br />scheduling and planning skills, quick problem solving, work <br />LICENSES <br />prioritizing, Productivity <br />maximization, and great foresight. <br />Civil Engineer (CA) <br />No, $1236 <br />PrO)eCt Experience <br />Coltrane Resident <br />Engineer Academy <br />...................... ............ <br />City of Stanton Public Works Department and Engineering Department <br />CITY OF STANTON I STANTON, CA <br />Caltrans CMOs Engineers <br />Public Works Director and City Engineer, Mr. Doss managed the Public Works <br />Academy <br />Department and Engineering Department for a city with a Population of 40,000. <br />Robert directed personnel, made City Council Presentations, interacted with public <br />citizens and controlled a budget of over $12 hililon annually. In addition, Robert <br />managed the construction of $16 million in capital Improvement projects, including <br />design, budgeting, and construction; the projects were completed ahead of schedule <br />with a savings Of U million dollars. <br />Reach Boulevard Sound Wall <br />CITY OF STANTON I STANTON, CA <br />Construction Manager. Mr, Doss managed this retaining wall and sound wall <br />construction Projectthat Included CIDH piles, The project Involved Poured concrete <br />retaining walls With masonry sound walls on top of the retaining walls, <br />State Route 55 <br />CALTRANS DISTRICT 12 --STATE OF CALIFORNIA <br />Resident Engineer, Mr. Doss oversaw this retaining wall and sound wall freeway <br />construction project, Including 25 CIDH Pies. The project Involved poured concrete <br />retaining walls with masonrySOUnd wells on top Ofthe retaining walls. <br />State Route 9.1 <br />CALTRANS DISTRICT 1.2 —STATE OrCAUFORNIA <br />Resident Engineer. Mr, D08S oversaw this retaining wall and sound wall freeway <br />construction project, Including 42 CIDH piles, The Project involved poured concrete <br />retaining walls with masonry round walls on top of thereleming walls, <br />Interstate 5/Red Hill <br />CALTRANS DISTRICT 12 —5TATE OF CALIFORNIA I ORANGE COUNTY, CA <br />Resident Engineer. Mr. Doss oversaw this $20M freeway construction project, <br />Including demolillo n and construction of new bridge, The project Involved major night <br />work <br />because freeway lanes could only be closed between 11 P.m. and 5 a.m. This <br />V <br />bridge expansion was a cast -In -place concrete box girder span. <br />