My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5
Clerk
>
Contracts / Agreements
>
N
>
NV5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 10:48:54 AM
Creation date
7/24/2018 10:46:37 AM
Metadata
Fields
Template:
Contracts
Company Name
NV5
Contract #
A-2018-160-04
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
5/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOSCIENC,F. TERRY A. WATKINS, JR. PG, CHG <br />Senior Geohydrologlst <br />Mr. Watkins has over fourteen years of experience In many different types of <br />projects, Including geohydrologic Investigations, ground water quality studies, <br />artificial recharge projects, water well test drilling programs, sea water <br />desalination programs, and the management and supervision of water well <br />projects including: siting, design, aquifer pumping test analyses and well <br />construction, Listed below are various examples of Mr. Watkins' exparlence: <br />City of South Pasadena —Rehabilitation of Wilson Well #2. 2016 <br />Developed rehabilitation recommendations and work plan for contractor <br />activities. Served as project and construction manager during rehabilitation, <br />ts�rf t4 redevelopment, and testing of the well. This work successfully' doubled <br />It E SCIENCB 12,• <br />s3s ° •= production capability of this well. <br />1�{ <br />City of Huntington Beach —Replacement of Well No,.l <br />:Nf onfryttion `h4anagBment 2014 to Present <br />osri' xe�a.,.: r <br />i and water Hyd logy <br />` �` <br />Prepared preliminary design documents and drawings as well as technical <br />a <br />i iVufRa r Resource Management <br />plandrilling, construction, development, and specifications for the drilliand <br />star tsa dias <br />testing of the City of Huntington Reach Replacement Well No.1, Will provide <br />construction management services,' including well design recommendations, <br />..k46tlon:. <br />during construction activities: which should begin second quarter of 2017. <br />%California Stote Polytechnic. <br />University, Pomona, 2,001 <br />'Pi`ofa.95101191 Registrations; <br />Callfornia Professional Geologist <br />(No. 9046) <br />Certified California Hydrogoologist, <br />(No. 1033) <br />West Valley Water District —Rialto Colton Monitoring Well No.1, <br />2015 to 2016 <br />Project manager for the drilling, design, construction, and development of a <br />910 ft stainless steel monitoring well to serve as a sentinel well monitoring <br />Perchlorate migration. <br />Pico Water District. 2016 to Present <br />Project manager overseeing all aspects of this project. Tasks completed to <br />date Include well siting assessment and recommendation, drafting of technical <br />Plans and specifications, contractor bid assistance, and permitting witin <br />regulatory agencies. Construction and testing are scheduled to begin In <br />March, 2017 <br />�f�t i hl <br />n <br />G , <br />
The URL can be used to link to this page
Your browser does not support the video tag.