Laserfiche WebLink
CONTACTINFO <br />'pefe.gold l iigGny5.aom <br />a9:685,0477 <br />WERIENCg <br />4$ years <br />EtIUCAtI.ON <br />BA Mathematics <br />LICENSBS <br />arofassional Land <br />surveyor, CA OLS4768 <br />PETE GOLDING, PLS <br />Survey/Mapping <br />Mr. Golding brings 43 years of Mparlenee that includes a wide variety of projects <br />In both land development and public works projects: He has completed surveying <br />projects in California, Nevada and Wisconsin and his expertise includes hundreds of <br />boundary ratraoements, many involving the Public Land Survey System, GPS surveying, <br />map and ALTA production, and construction surveying. He has extensive office and <br />field experience supporting his Clients. He has prepared hundreds of plats and legal <br />descriptions. He has prepared and been In responsible charge of many Parcel Maps, <br />Final Maps and Records of Survey, He has also performed many topographic surveys, <br />by photogrammetrlo methods as well as by field Collection methods. <br />Project Experience <br />Sunrise Powerllnk Project i San Diego Gas & Electric I :San Diego <br />County, CA <br />Project manager for survey and acquisition drawings for approximately 1s8 miles of <br />new transmission corridors through San Diego County, Project Included the subdivision <br />Of approxirnatsly 86 sections through 20 townships, Field crews recovered more than <br />100 GLO/BLM monuments, many from the surveys performed in the 18808. ALTA <br />surveys were performed on mitlgatlon properties purchased bySDG&E, followed by <br />filing records of survey with the county surveyor, <br />QualComm Stadium Expansion I Qualoonlm Stadium I San Diego, CA <br />Project surveyor for topographic survey of Qualoomm stadium and surrounding parking <br />lot and facilities, Set and tied pre -marks to California Coordinate System and to existing <br />stadium control geometry. Provided additional survey data from field shots on columns, <br />walls, seating levels, <br />International Boundary Water Cammissfon I US/Mexico Border <br />Responsible For survey projects on the US/Mexico border Involving sewer and drainage <br />issues affecting both countries. Provided survey control for construction of the new <br />Sewage Treatment Plant, <br />Beach Restoration I County of San Diego I San Diego, CAA <br />Set and tied survey control points for photogrammetric survey of several of San Diego <br />County`s beaches including Imperial (beach and north County beeches from La Jolla to <br />Oceanside. After restoration design, provided survey control for fill sand dredged horn <br />offshore and pumped onto the beaches. <br />The Crosby Estate I The Crosby Family I Rancho Santa Fe, CA <br />Responsible for construction $taking at new golf course community In Rancho Santa <br />Fe. The prajeot Included a now golf course, driving range, golf club, tennis and <br />I V swim club as well as a mix of residential units including single family homes and <br />condominiums, Performed stakingfor now hiking trail along the San piegulto River. <br />Navy Clean 11 i Bechtel Corporation I Southern California <br />Survey Manager for projects performed under contract with the Bechtel Corporation for <br />the federal program to remove environmental hazards from milltary bases throughout <br />Southern California. Much of the work Involved GPS Surveying to set up Control on the <br />bases for Investigative/exploratory work by envirohmental teams. <br />