My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5 (2)
Clerk
>
Contracts / Agreements
>
N
>
NV5 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 10:51:09 AM
Creation date
7/24/2018 11:03:33 AM
Metadata
Fields
Template:
Contracts
Company Name
NV5
Contract #
A-2018-159-05
Agency
Public Works
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
5/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT UNDERSTANDING <br />WATER RESOURCES (OPTION A) <br />We understand that the City is seeking the design and <br />construction support services for the Santa Ana Water <br />Project. This project includes the rehabilitation of an <br />existing water well approximately 90 years old, and the <br />design of 1500-foot of 12-Inch PVC water main and the <br />construction of 80O-feet of 15-Inch sewer main on an <br />arterial street. The City would like for the consultant to <br />provide feedback regarding the material of choice for the <br />sewer main improvements. Also, the City would like to <br />connect this well to the water system, as of right now It <br />does connect to an existing on5ite reservoir. This well is <br />a sand producer, and ourrdntly the capacity has dropped <br />by approximately 55%0 of Its maximum yield of 2000GPM. <br />The depth of the well is approximately 1100 feet, it has <br />a vertical turbine pump with a 250hp motor. In addition, <br />the screens are made of mild steel. No video or any other <br />preventive maintenance has been done in the past 15 <br />years. <br />Well Rehabilitation <br />Our proposed scope of work is divided Into a two-phase <br />approach. Phase I will include reconnaissance of the <br />well to characterize the current condition and develop <br />a rehabilitation plan. Phase 11 will be to perfonn the <br />rehabilitation necessary to restore the well to proper <br />working order. <br />Since the rehabilitated well is to be connected to <br />the distribution system, NV5's design will include <br />considerations for the following required appurtenances: <br />Flow control valve <br />Pump to waste system <br />Chlorination <br />SCADA connection <br />It Is assumed that the well will be re -equipped with a <br />now pump, motor, MCC, and appurtenances. <br />Water and Sewer mllins <br />Both the water main and sewer extensions will be <br />designed according to City standards. NV5 would typically <br />specify high -strength VCP for the proposed 15-inch sewer. <br />PROJECT UNDERSTANDING <br />GENERAL ENGINEERING (OPTION B) <br />We understand that the City Is seeking the design and <br />construction support services for the Mlle One Street <br />Project. This project will follow a complete street concept. <br />The length of the project is approximately 1,000 linear <br />feet. Both intersections at the outer limits of the project <br />have been modified as part of the complete street project <br />under previous phase. The proposed project consists of <br />street rehabilitation, bicycle lane, sidewalk, and parkway <br />improvements. The sidewalks are 5 feet wide and the <br />parkways are 4 feet wide. The project also includes <br />widening of the east side of the street to accommodate <br />a new bicycle lane. The right of way Is approximately 3.2 <br />feet wide with three traffic lanes in each direction with a <br />14 foot wide median. The required right of way has been <br />acquired by the City. <br />GENERALAPPROACH <br />Mi-k Breakdown SOncture <br />Upon issuance of a notice to proceed, our project manager <br />will meet with team members to review the requirements, <br />prepare a Work Breakdown Structure and make team <br />assignments for maximum efficiency of resources. The <br />detailed WBS will describe all of the work tasks necessary <br />to complete the project. A master project schedule will <br />be prepared following the WBS to show the relationship <br />between tasks, the expected start date and duration <br />for each iteri. This schedule will serve as a guide to <br />conducting and monitoring the progress of the work and <br />to ensure projects are completed on time and within <br />budget. To ensure accurate monitoring and tracking of <br />documents, revisions and progress, a document tracking <br />and control system will be developed. We will meet <br />with City project representatives regularly and maintain <br />constant communication to ensure successful and timely <br />delivery of the project. Meeting minutes will be distributed <br />within one week of the meeting identifying actions, items, <br />assignments and due dates. <br />We are able to continually review and evaluate a project <br />cost through all project phases to enable informed and <br />
The URL can be used to link to this page
Your browser does not support the video tag.