Laserfiche WebLink
Project Experience <br />Annexation EIR, Orange County Water District, (Technical <br />Lead) <br />John served as Technical Lead for an EIR prepared for the <br />Orange County Water District's (OCWD) efforts to annex <br />additional sections of Irvine Ranch Water District, the City of <br />Anaheim and Yorba Linda Water District into the District's <br />boundaries. <br />Integrated Regional Water Management Plan, San Tlmoteo <br />Watershed Management Authority (STWMA)*, Banning, <br />California (Project Manager) <br />John served as Project Manager for the San Timoteo <br />Watershed Management Authority (STWMA)'s Integrated <br />Regional Water Management Plan (IRWMP). <br />San Vicente Dam Raise EIR/EIS, San Diego County Water <br />Authority*, San Diego, (Project Director) <br />John served as Project Director for an EIRIEIS prepared for <br />the San Diego County Water Authority (SDCWA)'s San <br />Vicente Dam Raise and Carry-over Storage Project. When <br />completed, this project will double the height of the existing <br />dam and add 150,000 acre-feet of additional carryover storage <br />capacity. <br />Long Term Facilities Plan Programmatic EIR, Orange <br />County Water District*, (Project Manager) <br />John served as Project Manager for a Program EIR prepared <br />for the Orange County Water District's (OCWD) Long Term <br />Facilities Plan (LTFP). The purpose of the LTFP was to <br />propose innovative long-term alternatives to maximize the <br />beneficial use of all sources of water available to the <br />Groundwater Basin. <br />On -Call Services Related to Water, Wastewater and <br />Stormwater Services, City of Pasadena, Pasadena, <br />California (Principal) <br />John is serving as PiC for an on -call contract to provide water, <br />wastewater and Stormwater engineering and planning services <br />for the City of Pasadena Department of Public Works, Water & <br />Power division. <br />Integrated Regional Water Management Plan (IRWMP), Los <br />Angeles County", Los Angeles, California (Project <br />Director) <br />John served as Project Director for development of the LA <br />County Integrated Regional WaterManagement Plan, <br />On -Call Services Related to Hydrogeological Services, <br />Sonoma County Water Agency, Sonoma County, <br />California (Principal -in -Charge) <br />John is serving as PIC for an on -call contract to provide <br />hydrogeological services for the SCWA. <br />Chorro Reservoir Dredging Feasibility Plan and Dam <br />Emergency Action Plan, California Department of <br />Corrections and Rehabilitation, San Luis Obispo County, <br />California (Principal -in -Charge) <br />John Is serving as PIC for project to consider the feasibility of <br />dredging sedimentfrom the existing Chorro Reservoir to <br />restore the original storage capacity, The project also Includes <br />the preparation of a Dam Emergency Action Plan (EAP) per <br />the requirements of the State Division of Safetyof Dams <br />(DSOD) <br />Agricultural Irrigation Conservation Program, South San <br />Juaqain Irrigation District, Manteca, California (Principal) <br />John is PIC for a comprehensive program to implement an <br />advance water conservation program for the District that <br />Includes converting the existing irrigation delivery system to a <br />pressurized, micro -spray and drip delivery system. <br />On -Call Services Related to Water, Wastewater and <br />Stormwater Services, City of Pasadena, Pasadena, <br />California (Principal -in -Charge) <br />John is serving as PIC for an on -call contract to provide water, <br />wastewater and stormwater engineering and planning services <br />for the City of Pasadena Department of Public Works. <br />Toxicity Reduction Evaluation (TRE), California <br />Department of Corrections and Rehabilitation, Tracy, <br />California (Task Manager) <br />John served as Task Manager for the preparation of a Toxicity <br />Reduction Evaluation (TRE) for the Deuel Vocational Institution <br />WWTP. <br />Upper San Joaquin River Watershed Management Plan, <br />Southern California Edison, Fresno County, California <br />(Project Manager) <br />John served as Project Manager for watershed planning <br />program utilizing real time simulation (RTS) modeling to <br />optimize operation of a large hydro -electric project. <br />San Joaquin Facilities Program, SFPUC, Central Valley, <br />California (Environmental Compliance Manager) <br />John served as the Environmental Compliance Manager for <br />the SFPUC's San Joaquin Facilities Program, which included <br />Installation of a fourth pipeline, as well as improvements to <br />existing facilities in the lower San Joaquin Valley. <br />City of Santa Ana, Cellfomla I Water and Sewer Enterprise Cost or Service Study Slanted 27 <br />