My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25N - AGMT BIKE STATION DESIGN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
08/21/2018
>
25N - AGMT BIKE STATION DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 11:17:47 AM
Creation date
8/16/2018 11:13:17 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25N
Date
8/21/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverable included: <br />• 50% set of plans for all disciplines including <br />Architectural <br />- Plans, Outline Elevations (Exterior and <br />Interior), Key details identified <br />• Civil <br />- Improvement plans for the construction <br />of bikeway connection to the parking <br />structure entrance consisting of new bike <br />lanes, sidewalks, curb ramps, and ADA <br />improvements.Striping and signing plans <br />at a scale of 1" = 20' for the proposed <br />improvements within the limits of the <br />project. Striping and signing plans will <br />comply with the City's standards, Caltrans, <br />and the California MUTCD. <br />• Landscape <br />- Landscape and irrigation plans for the <br />proposed parkways, and open spaces <br />within the project limits <br />• Mechanical, Electrical, Plumbing, Fire Alarm, <br />Fire Protection <br />- Plans, notes and schematic details <br />• Draft Outline Specification <br />• Development of an "Opinion of Probable Cost <br />Estimate" <br />• Unit prices will be used based on readily <br />available current bid information based on <br />similar projects. <br />Task 3 <br />CONSTRUCTION DOCUMENTS PHASE - 901100% <br />At this stage, the project moves into final <br />documentation and preparation application and bid <br />documents. <br />Activities include the following: <br />• Prepare the construction documents and <br />specifications for the project based on the <br />approved design development documents <br />Two submissions to the City Staff in PDF format: <br />• Submission 1 — 90% for Public Works Design <br />Engineering Division <br />• Submission 2 —100% addressing all <br />comments from 90% submission <br />- Being sent to Planning and Building Agency <br />- To be sent to Public Works Agency Design <br />and Construction Engineering Division <br />Development of detailed engineering and <br />construction drawings which will serve as basis <br />for bidding and construction by a General <br />Contractor <br />Deliverables included: <br />• Plans shall include; but are not limited to the <br />following: <br />• Title Sheet <br />• Site Plan, including: <br />- Project Location <br />- Path of Travel <br />- Signage <br />• Civil Engineering Plans <br />Plans, Details and Notes <br />Improvement plans <br />Striping plans <br />• Landscape Plans <br />- Plans, Details and Notes for all landscape <br />and irrigation elements <br />• Architectural <br />- Building Floor Plan, Schedules <br />- Interior and Exterior Elevations <br />- Building Sections, as required <br />- Architectural Details, developed <br />• Mechanical, Electrical, Plumbing, Fire Alarm, <br />Fire Protection <br />- Plans, Details and Notes <br />Gensler I Santa Ana Regional Transportation Bike Station <br />25N-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.