Laserfiche WebLink
Stephen J., 'Waide <br />Heath. & Safety Officer <br />City of Bevedy Hills, As -Needed Environmental Consulting and Materials, Beverly Hills, California: As ProjectCIH, currently <br />oversees environmental surveys Including asbestos and lead-based paint surveys'for renovations and demolitions, including <br />abatement monitoring and clearance Inspections. In addition, various mold and molsture evaluations'have been performed. <br />Surveys, monitoring, and mold evaluations were performed for at least 12 facilities including public libraries; community center <br />buildings, commercial office buildings,'and historic public park "structures. <br />City of Long Beach As -Needed Environmental Consulting and Materials Testing and Inspection Services, Long Beach, <br />California: Mr. Walde has overseen, environmental surveys Including asbestos and lead-based paint surveys, abatement: <br />monitoring, air quality, and ernrl onmental'sampling and testing for the City of Long Beach under an as -needed contract. Various <br />structures_ include beach restrooms and lifeguard buiidings,,city buildings, public park structures, community'buildings, and <br />librades,. <br />City of Los Angeles Bureau of Engineering, Multiple On -Call Geotechnical and Environmental Engineering Services <br />Contracts, Los Angeles, California: Mr. Walde serves as Health and Safety Oflicer for both the geotechnical and ilia <br />environmental services portions of these on-call agreements with the Bureau of Engineering. Under the environmental portion <br />of these contracts, Ninyo $ Moore mainly provides Phase I Environmental Site Assessments (ESAs), Phase'II ESAs, methane <br />surveys,• groundwater monitoring and sampling, remedation feasibility studies, and remedial action planning, in his role as Health <br />and Safety Officer, Mr. Walde provides technical support in the'fields of industrial hygiene and construction safety to the Contract <br />Manager, Task Managers, and support staff. Mr. Walde also provides senior level review of documents providing waste and <br />Worker safety recommendations relating to environmental issues on proposed construction sites. <br />County of Los Angeles'Department of Public Works, As -Needed Environmental Services Contracts, Los Angeles County, <br />California: Mr. Walde served as Health and Safety Officer for this multiple award, on-call contract for various sites throughout <br />Los Angeles County, Projects included evaluation of asbestos, lead, and mold; underground storage tanks (USTs); hazardous <br />materials and wastes; former landfllls; and other contaminants Inion building materials, soil, groundwater, and air. Typical projects <br />included.the preparation of assessment reports, plans, drawings and cost estimates for abatement, remediation, and disposal of <br />contaminants, and many Included providing bidding/construction support, abatement monitoring, and site closures. Mr. Waide's <br />role on the Helen Keller Park project included addressing client and public concerns with exposure to asbestos and other on-site <br />contaminants associated with the park remodeling project (historic landfill, Solid Waste Assessment Test [SWAT] analysis, Phase <br />I ESA, methane mitigation design, hazardous building materials, geotechnical, etc.). <br />step6n J. Walde, CIH, CSP, CMC, CIEe, Health & Safety CFllcer I. Wye & Moore I G6Waikal & Environmental Scenes Cortsultents <br />25F-227 <br />