Laserfiche WebLink
Michael S. Cushner, CAC, LRC I/A and PM <br />Project Manager <br />EDUCATION <br />B.S., Management, 1986, Widener <br />University <br />REGISTRATIONS/ <br />CERTIFICATIONS <br />CAIDOSH Certified Asbestos Consul- <br />tant No. 11.4711 <br />CDPH Lead -Related Construction <br />Inspector/Assessor No. 16953 <br />CDPH Lead -Related Construction <br />Project Monitor No. 16953 <br />NIOSH 582 Equivalency Course <br />Mold— Indoor Air Quality Course <br />OSHA 40 -hour HAZWOPER <br />w/ annual 8 -hour refreshers <br />OSHA 8 -hour HAZWOPER Site Su- <br />pervisor Training <br />Mr. Michael Cushner Is A Senior Project Environmental Scientist and Is responsible <br />for the project coordination and technical thoroughness of our local Environmental <br />Division's asbestos and lead inspection surveys, abatement monitoring oversight, <br />mold and moisture evaluations, and other hazardous materials surveys. He directs <br />these projects, including supporting Cities, large construction projects, highway <br />improvements, commercial and industrial buildings, K-12 school districts, and <br />community college districts. In addition to leading a team of Industrial hygienists, <br />Mr. Cushner reviews technical reports, provides hazardous building material <br />abatement recommendations, prepares abatement bidding and work plan <br />specification documents, assists clients with contractor selection and pre-bid job <br />walk support, and Is the main client point of contact for this work. <br />EXPERIENCE <br />City of Santa Ana, YMCA Building Renovation Project, Santa Ana, California: <br />Mr. Cushner performed project management from 2015 through 2017 on all aspects <br />of the work related to the YMCA building renovation project, The 45,000 square <br />foot structure has been vacant for over a decade. An initial hazardous building <br />material survey was performed for the structure, which is considered a historic <br />landmark. Findings Included damaged asbestos, lead paint,. universal wastes, <br />and biological waste contamination, Completed tasks Included providing a current <br />hazardous building material survey and report, preparation of abatement bidding <br />specification documents, preparation of an estimated cost of abatement document, <br />assisted the City of Santa Ana with hosting a job walk for the needed abatement, <br />preparation of a South Coast Air quality management district procedure 5 plan, <br />provided abatement monitoring and clearance services over a 4 -month duration, <br />and preparation of an abatement closeout report. <br />City of Temple City, Various Projects, Temple City, California: As Project <br />Manager, directed hazardous building material surveys for upcoming demolition <br />of a previous mortuary and four apartment buildings as the city was planning <br />to purchase these properties. Asbestos and lead surveys were performed, <br />including developing an inventory of universal waste materials. Abatement <br />bidding specifications were prepared for the mortuary, Including supporting the <br />City with a pre-bid job walk for abatement and demolition contractors. Abatement <br />monitoring services were performed for the mortuary, including closeout report <br />documentation. Abatement monitoring services for the four apartment buildings Is <br />planned for Summer, 2018. <br />City of Irvine, Orange County Great Park, Irvine, California: As Project Manager, <br />directed hazardous building material surveys and abatement monitoring services <br />of various commercial structures In support property redevelopment. The surveys <br />were performed, including developing an Inventory of universal waste materials. In <br />addition, specific abatement plans were prepared for the City in order to address <br />sub -surface asbestos piping abatement. A Procedure 5 Plan was prepared in <br />accordance with the local South Coast Air Quality Management District Rule 1403 <br />requirements, Abatement monitoring and clearance services was performed, for <br />all hazardous materials documented to be present from our surveys, and closeout <br />report preparation for each structure or subsurface abatement location. <br />Michael S. Cushner, CAC, LRC VA and PM, Project Manager I Nlnyo 8 Moore I Geotechnical & Endrenmentd Sciences Consultants <br />25F-228 <br />