Laserfiche WebLink
Environmental ■ Facilities ■ Geotechnical v Materials <br />Approach to Meeting Your Needs and Statement of Proposed Services (by Task) <br />Terracon approaches each project, from minor asbestos, lead and mold surveys to indoor air <br />quality and complex hazardous materials and industrial hygiene projects, with the four -phased <br />methodology outlined below. <br />FOUR PHASE PROJECT APPROACH WITH DELIVERABLES <br />e • <br />•Proposed Work Plan .Site Visit • Written Pr=dures a tlearence Sampling <br />•sampffag Plan • Imx tlgatlonaeport • Abatement SpeciRmtIons • Summeryletter <br />• Meetbies/ReWng • TrainingCert ffr <br />Our professionals are experts working through all phases of work Including initial survey and <br />design, pre-bid phase, construction phase and project close-out. We work as a team, <br />collaboratively with architects, construction mangers, general contractors, abatement firms, <br />public agency representatives and others. Careful collaboration ensures we select the <br />appropriate project approach that will comply and ultimately be well received by project stake <br />holders and comply with all requirements of the program while allowing flexibility in adapting to <br />changing needs, design alterations and priorities of a public agency. Additionally, we have one <br />of the largest staff of certified personnel in California which allows us to meet aggressive <br />schedules and manage multiple projects concurrently. <br />Below, we have outlined the tasks necessary for successful completion and deliverables for this <br />contract. <br />• Task 1— Record Review <br />• Task 2 — Asbestos Survey <br />• Task 3 — Lead Survey <br />• Task 4 — Mold Survey <br />• Task 5 — PCB Survey <br />• Task 6 — Other Hazardous Material Testing <br />• Task 7 8 8 — Report Preparation and Distribution <br />• Task 9 —Abatement Work Plan / Specifications and Cost Estimate <br />• Task 10 — Consultation and Abatement Monitoring <br />Assumptions and/or Constraints <br />Terracon assumes our hazardous matedaVenvironmental services will typically be part of larger <br />construction projects. However, we can also provide these services for the purposes of due <br />diligence for project planning or property acquisition. <br />it City of Santa Ana Public Works Agency— Various Environmental Services (RFP No. 18-043) <br />— A2 Hazardous Materials Surveys <br />25F-266 <br />