My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT LIGHTING FIXTURES CORP YARD
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25C - AGMT LIGHTING FIXTURES CORP YARD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:39:08 PM
Creation date
8/30/2018 7:26:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25C
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X. Project Case Studies <br />Poway Unified School District <br />37% Annual Energy Savings <br />PROJECT DESCRIPTION <br />This project was installed for the Poway Unified School District in Poway, California from 2014 - 2016, ERC worked <br />as.a subcontractorfor Samhom Construction and together the companies won a bid RFP that was valued at $1.5M. <br />The project featured funding from California Prop 36, as well as significant rebates from SDG&E, <br />SCOPE OF WORK <br />Project Images <br />✓ Designed and installed new LED lighting for two elementary and two high schools in the PUSD. <br />✓ The retrofit solution included the replacement of all HID and Fluorescent technology with LED. <br />✓ CREE LED troffer fixtures, CREE BI -Level wall packs, LED Can retrofit kits, LED Type A Tubes with new <br />ballasts, and CREE Area Lights. <br />✓ installation of low voltage 0.10V dimming controls in all classrooms and offices. <br />✓ Overall reduction of 37% in energy use. <br />✓ Overall project cost =$11M. <br />PROJECT CHALLENGES & SOLUTIONS <br />✓ The District stated It was Important that the new dimming controls technology be easy to use by the school <br />room teachers and the school staff. <br />✓ Our Team designed a Lighting Controls Solution that included occupancy sensors, controls, and dimming <br />technology that were easy to use by the. staff. ERC offered a commissioning process which featured both <br />training for the staff as well as system setup in each room. <br />✓ Low Voltage 0-1 OV dimming controls were designed to ensure that dimming circuit #1 controlled the two <br />fixtures directly in front of the classroom projector screen, whereas the balance of the fixtures in the <br />classroom were controlled by dimming circuit #2. <br />t 41EmERsy REmoFir Co. <br />25C-94 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.