My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT LIGHTING FIXTURES CORP YARD
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25C - AGMT LIGHTING FIXTURES CORP YARD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:39:08 PM
Creation date
8/30/2018 7:26:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25C
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTC Aerospace <br />55% Annual Energy Savings <br />PROJECT DESCRIPTION <br />UTC Aerospace awarded a design•build contract to Install new LED lighting to Improve safety in the "high traffic° <br />areas surrounding the exterior areas on their 18 -acre Riverside campus. Because of the dramatic Improvement in <br />exterior lighting, UTC management requested that ERC perform additional upgrades in critical Interior work <br />environments, Including the Airbus airplanes assembly building. <br />Protect Images <br />SCOPE OF WORK <br />✓ Designed & installed new LED Itghting throughout the campus. <br />✓ The retrofit exterior solution Included the replacement of all High -Pressure Sodium Ilghting with LED <br />Lighting design software (AG192) was used to ensure that new lighting would be significantly Improved in all <br />areas <br />✓ New LED High Bay fixtures were installed to replace T5 Fluorescent In the Airbus assembly building <br />✓ Overall reduction of 55% in energy use, <br />✓ Total project cost - $550,000 (additional work ongoing) <br />PROJECT CHALLENGES & SOLUTIONS <br />✓ The outdated High -Pressure Sodium lighting offered poor light quality and coverage, UTC management had <br />deemed the roadways on the property to be unsafe for employees. <br />✓ New LED Area lights, Flood lights, and Wall packs were installed throughout the campus dramatically <br />Improving light output and coverage, Improving overall visibility and safety. <br />✓ Our Team designed a High Bay LED solution for the Airbus assembly area to both improve light levels and <br />Incorporate 0.10V dimming technology to allow the assembly technicians to dim the lighting during a <br />.process that requires the use of lasers to guide them when assembling critical components of the aircraft. <br />Q 7N.ENERmy RErRoFwr Com. <br />Ly. Sb 'Aw.g Mc <br />25C-95 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.