My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:43:13 PM
Creation date
8/30/2018 7:26:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GUARANTEED DELIVERABLES <br />There are several important areas of work requiring special attention to ensure successful <br />completion of a project: <br />Standardization & Maintenance of Project Documentation — In order to effectively combat <br />claims, it is vitally important that the construction manager and Inspector follow a uniform <br />standard to ensure that potentially volatile issues are dealt with In a timely, accurate and <br />consistent manner. Interwest has instituted such a system and has a proven track record of <br />helping its clients to avoid costly claims. <br />Monitoring Quality & Objectiveness of Field Personnel — Our construction supervisors <br />routinely check the files and performance of our construction inspectors. Regular training <br />meetings are conducted at which changes in rules and regulations are discussed, Of critical <br />importance are the storm water compliance rules and the requirements of the general <br />construction permit on City projects. <br />Public Relations — Public works projects that impact residents and businesses present unique, <br />non-technical challenges which must be addressed throughout the life of a project. Interwest <br />staff will work closely with these stakeholders to make them aware of the project, its status and <br />any changes that are made. Our assigned staff possesses the non-technical skill set needed to <br />navigate the public relations arena. <br />Construction Inspections (Including SWPP Compliance) — Our Inspector, as well as any <br />other field personnel performing services will document all work, quantities, contractor and <br />subcontractor personnel and equipment, visitors, and field orders on a daily basis. <br />SECTION 3 <br />Fee Proposal <br />Per the RFP, our fee proposal has been submitted in a separate, sealed envelope. <br />INTERWEST Page 119 <br />CONSULTING GROUP <br />25F-73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.