accommodating to the demanding design requirements for a data center and <br />will require extensive renovations to serve as such. Additionally, the <br />equipment loading may significant effect the structural stability of the third and <br />fourth floors, thus a structural analysis would need to be completed upon <br />knowledge of the exact data center equipment anticipated. Finally, the <br />significant revamping of the space and systems for a total of 7.6% of the total <br />floor area may not be cost-effective given the uncertainty of changing <br />technology and structural adaptability. <br />Jail Reuse Feasibility Study <br />Vanir Consultant Team Recommended Feasibility Options Ranking <br />Based on the results of the analysis and evaluation process, a summary <br />ranking from best to worst for the implementation of the proposed five jail <br />reuse feasibility options was established by the Vanir consultant team. <br />Analysis of this information and related fiscal impact data was used to form <br />the following recommended implementation ranking: <br />Commercial Data Center Use <br />Recommended Ranking: Jail Reuse Implementation Option #5 <br />References and Acknowledgements: <br />New $10 Million Offer for Wapato Could Signal a Data Center, <br />hftos://r)ami)linmedia.com/pt/9-news/351712-231175-new-1 0-million-offer-for-wapato-could-signal-a- <br />data-center <br />Wapato Detention Facility, https://multco.us/multnomah-county/wapato-detention-facility <br />2 Data Center Design Criteria, https://pdhonline.com/courses/el73/el73content.odf <br />3 Scott Tomlinson, Area Manager (Seattle, WA), Vanir Construction Management, Inc. <br />The Need for a New Data Center Design Standard, <br />https://www.missioncriticalmagazine.com/ext/resources/whitepapers/Intention Data Center Design St <br />andards v10.pdf <br />5.https://colohouse.com/ <br />127 <br />65A-134 <br />