My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - CIP
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
04-23-2018
>
1 - CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 2:07:13 PM
Creation date
9/13/2018 2:04:50 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Main Street Traffic Signal Synchronization <br />PROJECT CATEGORY: <br />Traffic Improvements <br /> Traffic Improvements <br />PROJECT NEED: <br />OCTA Traffic Signal Synchronization Master Plan <br />identified that Main St Corridor is part of countywide <br />corridor system that needs multi-jurisdiction <br />synchronization. This project will provide traffic signal <br />upgrades and synchronize traffic signals across <br />jurisdictional boundaries to reduce traffic congestion <br />and maintain the synchronization improvement for 3 <br />years. <br />PROJECT DESCRIPTION: <br />To provide inter-agency traffic signal coordination and <br />traffic infrastructure upgrades on Main St from <br />Taft Ave in City of Orange through Santa Ana to Culver <br />Dr in City of Irvine. The project involves the Cities of <br />Santa Ana, Orange, Irvine and Caltrans D12. <br />PROJECT FUNDS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />M2 LOCAL <br />FAIRSHARE <br />$350,000 <br />TOTAL $350,000 <br />PROJECT COSTS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />Construction $305,000 <br />Engineering $45,000 <br />TOTAL $350,000 <br />LOCATION MAP <br />CONTACT:DATE: <br />18-Apr-2018 <br />AGENCY: <br />Public Works Agency <br />DIVISION: <br />Traffic Engineering Cesar Rodriguez, Assistant Engineer II <br />- 27 - <br />CITY OF SANTA ANA FY 18/19 <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-46
The URL can be used to link to this page
Your browser does not support the video tag.