My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - CIP
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
04-23-2018
>
1 - CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 2:07:13 PM
Creation date
9/13/2018 2:04:50 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Garden Grove Blvd/ Memory Traffic Signal <br />Synchronization <br />PROJECT CATEGORY: <br />Traffic Improvements <br /> Traffic Improvements <br />PROJECT NEED: <br />OCTA Traffic Signal Synchronization Master Plan <br />identified that Garden Grove Blvd/ Memory Ln Corridor <br />is part of countywide corridor system that needs multi- <br />jurisdiction synchronization. This project will provide <br />traffic signal upgrades and synchronize traffic signals <br />across jurisdictional boundaries to reduce traffic <br />congestion and maintain the synchronization <br />improvement for 3 years. <br />PROJECT DESCRIPTION: <br />To provide inter-agency traffic signal coordination and <br />traffic infrastructure upgrades on Garden Grove Blvd/ <br />Memory Ln from Valley View St in City of Garden <br />Grove through the Cities of Westminster and Orange to <br />Bristol St in City of Santa Ana. The project involves the <br />Cities of Santa Ana, Garden Grove, Westminster, <br />Orange and Caltrans D12. <br />PROJECT FUNDS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />M2 LOCAL <br />FAIRSHARE <br />$15,000 <br />TOTAL $15,000 <br />PROJECT COSTS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />Construction $15,000 <br />TOTAL $15,000 <br />LOCATION MAP <br />CONTACT:DATE: <br />18-Apr-2018 <br />AGENCY: <br />Public Works Agency <br />DIVISION: <br />Traffic Engineering Cesar Rodriguez, Assistant Engineer II <br />- 28 - <br />CITY OF SANTA ANA FY 18/19 <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-47
The URL can be used to link to this page
Your browser does not support the video tag.