My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - CIP
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
04-23-2018
>
1 - CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 2:07:13 PM
Creation date
9/13/2018 2:04:50 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Warner Garnsey Sewer Main Diversion <br />Improvements <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting Improvements <br /> Sewer Improvements <br />PROJECT NEED: <br />Sewer diversion at this intersection will move flow to <br />another conveyance sewer line that can handle the <br />additional hydraulic capacity of the existing sewer along <br />Warner Avenue. <br />PROJECT DESCRIPTION: <br />Flow Diversion and sewer main upsize <br />PROJECT FUNDS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />SEWER <br />CONNECTION <br />PROJECTS <br />$200,000 <br />TOTAL $200,000 <br />PROJECT COSTS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />Engineering $200,000 <br />TOTAL $200,000 <br />LOCATION MAP <br />CONTACT:DATE: <br />18-Apr-2018 <br />AGENCY: <br />Public Works Agency <br />DIVISION: <br />Design Engineering Armando Fernandez, Senior Engineer <br />- 49 - <br />CITY OF SANTA ANA FY 18/19 <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-67
The URL can be used to link to this page
Your browser does not support the video tag.