Laserfiche WebLink
PROJECT TITLE: <br />D-03 Channel Improvements at Alton Avenue <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting Improvements <br /> Storm Drain/Water Quality <br />PROJECT NEED: <br />Install new curb and gutter, AC pavements, upgrade <br />existing drainage system. <br />PROJECT DESCRIPTION: <br />Existing AC surface has been damaged due to water <br />seepage. Exposing the concrete channel structure, <br />further water exposure will make the road unsafe to <br />travel and compromise the integrity of the channel <br />structure over the road. <br />PROJECT FUNDS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />DAF: DA-III $100,000 <br />TOTAL $100,000 <br />PROJECT COSTS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />Construction $100,000 <br />TOTAL $100,000 <br />LOCATION MAP <br />CONTACT:DATE: <br />18-Apr-2018 <br />AGENCY: <br />Public Works Agency <br />DIVISION: <br />Design Engineering Jason Gabriel, Principal Civil Engineer <br />- 52 - <br />CITY OF SANTA ANA FY 18/19 <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-68