Mancy Anglin,
<br />EDUCATION
<br />B.S„ Geological Engineering Queens
<br />University, Kingston
<br />Graduate Studies, Civil Engineering,
<br />University of New Brunswick
<br />RE ISTRATION8t
<br />CERTIFICATIONS
<br />National Registry of Environmental
<br />Professionals; Registered Environ-
<br />mental Manager
<br />OSHA 40 -hour HAZWOPER with
<br />annual 8 -hour refreshers
<br />OSHA 8 -hour HAZWOPER Site Su-
<br />pervisor Training
<br />OSHA 24-hour First Responder Oper-
<br />ations Level
<br />OSHA Excavation Competent Person
<br />Certification
<br />Confined Space Entry Training
<br />First Aid and CPR Training
<br />PROFESSIONAL
<br />AFFILIATIONS
<br />WTS International
<br />Ms Anglin is a Principal Engineer and the local Environmental Division Manager for
<br />Ninyo & Moore, She is responsible for the day-to-day operation of this division, Ms.
<br />Anglin has developed and implemented quality assurance programs throughout her
<br />career, Ms. Anglin's other professional experience Includes acting as Contract or
<br />Project Manager for a number of Ninyo & Moore's on-call contracts, Her technical
<br />experience includes investigations of proposed Construction projects for waste
<br />management and worker safety requirements and evaluating properties proposed for
<br />acquisition to determine the environmental liability the purchaser may be acquiring
<br />along with the property, She prepares sollfgroundwater management plans and other
<br />environmental plans needed for construction projects involving contaminated sites,
<br />She prepares bid plans and specifications to provide to the contractors performing
<br />the construction activities on contaminated projects and responds to requests for
<br />Information (RFIs),
<br />KREHEW
<br />City of Santa Ana, YMCA Building Renovation Project Santa Ana, California:
<br />Ms, Anglin was the Quality Assurance Officer for the work related to the YMCA build-
<br />ing renovation project, a structure that has been vacant for over a decade. An Initial
<br />hazardous building material survey was performed on the 45,000 squarefootstruc-
<br />ture, which is considered an historic landmark, Findings included damaged asbestos,
<br />lead paint, universal wastes, and biological waste contamination. Reviewed a haz-
<br />ardous building survey report, abatement specifications, and oversight of abatement
<br />monitoring and clearance services, Ms, Anglin confirmed that appropriately licensed
<br />and trained personnel supported the project and reviewed all project deliverables to
<br />confirm quality.
<br />City of Irvine, On -Call Services for the Orange County Great Park, Irvine, Cal-
<br />ifornta: quality Assurance Officer for this on-call environmental support con- tract,
<br />The former Marine Corps Air Station El Toro is being transformed into the Orange
<br />County Great Park in the geographic center of Orange County, A project area span-
<br />ning approximately 4,600 acres, with more than 200 acres developed and 688 acres
<br />In planning and design and Tully funded, the park master plan Includes recreation;
<br />competitive sports facilities and parkland; preserves the environment and Grange
<br />County's agricultural heritage; and honors the military history of the former air base,
<br />To date services have included the oversight of removal of non -recyclable, non-haz
<br />ardours, and hazardous materials encountered during demolition and grading. Ninyo
<br />& Moore is expected to respond to environmental requests within 4 hours, Typical
<br />requests include: health and safety evaluations; identification, abatement, remedi-
<br />ation, or legal disposal of contaminated soil, lead based paint, asbestos -containing
<br />materials, underground tanks, drums, wastes, pipelines, and other materials that
<br />might have been used, abandoned, and not documented at a military facility of this
<br />type and vintage, Ninyo & Moore has responded to more than 15 callouts tc�date and
<br />completed assessments; provided oversight during removal and disposal activities
<br />performed by the City's remediation contractor; performed confirmation sampling and
<br />clearances; and prepared closure reports, Ninyo & Moore is also assisting the City
<br />with negotiations with the developer and providing risk assessment support related
<br />to on site reuse of contaminated materials removed during the various demolition
<br />activities at the site.
<br />Nancy Anglin, REM, duality Assurance Officerl Ninyo&Moore I Geotechnical&Environmental Sciences Gcnsultants
<br />
|