Laserfiche WebLink
City of Laguna Beach, Water Tank Ravine Burn Site Ren <br />once Officer for our environrnentaf consulting services to the <br />secondary burn sites situated In a ravine that is located in <br />was deficient and a supplemental assessment was conductec <br />Remedial Action plan (RAP) was prepared that recornmendec <br />tlnue monitoring the burn site; requlremehts to remove the to <br />meat of wastes downstream within the drainage channeiti ail <br />located within the drainage channel making It difficult to main <br />site, The RAP Included a Waste Management Plan, Field San <br />and Site Health and Community Health and Safety Plan, Pro <br />tors that Involved preparing remedial action specifications, c <br />and confirming wastes had been adequately removed, Cama <br />a school site and adjacent residences, Required permits we <br />tors for disposal Of various waste streams to appropriate was <br />was granted to <br />West Lincoln Avenue, and North Ohto <br />Is adjacent to the Anaheim High Scn <br />and records Indicated several of the <br />historloal Environmental Issues, Incim <br />forays), which Nlnyo & Moore deslt; <br />Department of Toxic Substances Cc <br />of chemicals of potential concern (CC <br />School Cleanup Agreement with the <br />In general, [and use In the <br />Ent structures presents]nrE <br />former gasoline stations an <br />I a sampling and analyses <br />I (DTSC). The PDA was p <br />a) detected lir the shallow t <br />$0, and will proceed with I <br />of Temple CIt,Y, Various Projects, Torr <br />staffing and deliverable reviews for pr <br />a demolition of a previous mortuary and <br />sbestos and lead surveys were perform( <br />I specifications ware prepared for the <br />Laguna Beach, California. Served as Quality Assur- <br />)port of the romedlai1on and restoration of primary and <br />ed open space area, previous waste charactarization <br />)ssfully characterized and delineated burned wastes, <br />ingr clean closure based on the City's desire tc dlacotr- <br />Of <br />late removal action was p <br />I (RWQCB) and the l odal <br />v <br />The <br />sed and included a health risk s <br />Je also assisted the school dlstrk <br />eparatIon of the Removal Action <br />Acted as <br />,hies which included hazardous: building material <br />,Ment buildings as the city was planning to purok <br />)g developing an Inventory of universal waste met <br />Including supporting the City With a preybld job <br />ig services wore performed for the mortuaru <br />out report documentafiorl, Abatement monitoring services for the four apartment buildings Is planned <br />City of Los Angeles Bureau of Engineering, Multip <br />Contracts, Los Angeles, California' Ms; Anglin at <br />services portions of these on-call agreements with It <br />contracts, Ndnyo & Moore mainly provides Phase ( <br />and sampling, remediation feasibility studies, and p <br />Me, Anglin ensures the tasks are staffed with aper€ <br />parfomied by Mata Certified laboratories, and ensures <br />On -Call Beotechnlcni and Environmental ( n <br />ss ,as .the Quality Assurance Officer for boat <br />Bureau of JEngmeering, Under the environmer <br />SAs, Phase if ESAs, methane surveys, grot <br />edial action planning, In her role as Quality <br />are reviewed by the <br />Nancy.Anulin, REM, Quilty Assurance Officer i N*O&Moore I Qaotechnlcal&.EpG ronenen)al Sciences Consitltaiits <br />and <br />obtaining the <br />Plan (RAW): <br />7rtlrg appro• <br />yeys; for up - <br />hose proper- <br />i, Abatement <br />k for abate <br />riding close - <br />comer, 2018, <br />.w pv,yv,r v, amav <br />ndwater monitoring <br />Assurance Officer, <br />propriate testing is <br />'harge of the work, <br />2 <br />