Laserfiche WebLink
LOS "D"Regrrirenrents <br />2. Tustin Avenue at First Street <br />4. SR -55 NB Ramps at Fourth Street/Irvine Boulevard <br />7.2 Traffic Impact Analysis Scenarios <br />The following scenarios are those for which volume/capacity calculations have been performed at <br />the four (4) key intersections for existing plus project, near-term (Year 2019) traffic conditions: <br />A. Existing Traffic Conditions; <br />B. Existing Plus Project Traffic Conditions; <br />C. Scenario (B) with Improvements, if necessary; <br />D. Near -Term (Year 2019) Cumulative Traffic Conditions, <br />E. Near -Term (Year 2019) Cumulative plus Project Traffic Conditions; <br />F. Scenario (E) with Improvements, if necessary; and <br />G. Scenario (H) with Improvements, if necessary. <br />75B-103 <br />