My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - TUSTIN AND 4TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
75B - PH - TUSTIN AND 4TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:21:49 PM
Creation date
11/15/2018 9:19:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.0 PEAK HOUR INTERSECTION CAPACITY ANALYSIS <br />8.1 Existing Plus Project Analysis <br />Table 8-1 summarizes the peak hour Level of Service results at the four (4) key study intersections <br />for existing plus project traffic conditions. The first column (1) of ICU/LOS values in Table 8-1 <br />presents a summary of existing AM and PM peak hour traffic conditions (which were also presented <br />in Table 3-3). The second column (2) lists existing plus project traffic conditions. The third column <br />(3) shows the increase in ICU value due to the added peak hour Project trips and indicates whether <br />the traffic associated with the Project will have a significant impact based on the LOS standards and <br />significant impact criteria defined in this report. The fourth column (4) presents the resultant level of <br />service with the inclusion of recommended traffic improvements, where needed, to achieve an <br />acceptable level of service. <br />8.1.1 Existing Plus Project Traffic Conditions <br />Review of columns (2) and (3) of Table 8-1 indicate that traffic associated with the proposed Project <br />will not significantly any of the four (4) key study intersections, when compared to the LOS <br />standards and significant impact criteria specified in this report. Although the intersection of SR -55 <br />SB Ramps at Fourth Street is forecast to operate at LOS E during the AM peak hour with the <br />addition of Project traffic, the proposed Project is expected to add less than 0.010 to the ICU value. <br />The remaining three (3) intersections are forecast to continue to operate at an acceptable LOS with <br />the addition of project generated traffic. <br />Appendix C presents the existing plus project ICU/LOS calculations for the four (4) key study <br />intersections. <br />75B-104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.