My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - TUSTIN AND 4TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
75B - PH - TUSTIN AND 4TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:21:49 PM
Creation date
11/15/2018 9:19:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.0 RECOMMENDED INTERSECTION IMPROVEMENTS <br />For those intersections where projected traffic volumes are expected to result in unacceptable <br />operating conditions, this report recommends (identifies) improvement measures that change the <br />intersection geometry to increase capacity. These capacity improvements involve roadway widening <br />and/or re -striping to reconfigure (add lanes) to specific approaches of a key intersection. The <br />identified improvements are expected to: <br />• mitigate the impact of existing traffic, Project traffic and future non -project (ambient traffic <br />growth and cumulative project) traffic and <br />• improve Levels of Service to an acceptable range and/or to pre -project conditions. <br />10.1 Existing Plus Project Traffic Conditions <br />The results of the intersection capacity analysis presented previously in Table 8-1 shows that the <br />proposed Project will not significantly impact any of the four (4) key study intersections under the <br />"Existing Plus Project" traffic scenario. Given that there are no significant project impacts, no <br />improvements are required under this traffic scenario. <br />10.2 Year 2019 Plus Project Traffic Conditions <br />The results of the intersection capacity analyses presented previously in Table 8-2 shows that the <br />proposed Project will not significantly impact any of the four (4) key study intersections under the <br />"Year 2019 Plus Project" traffic scenario. Given that there are no significant project impacts, no <br />improvements are required under this traffic scenario. <br />75B-110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.