My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - TUSTIN AND 4TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
75B - PH - TUSTIN AND 4TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:21:49 PM
Creation date
11/15/2018 9:19:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.0 CONGESTION MANAGEMENT PROGRAM (CMP) COMPLIANCE ASSESSMENT <br />This analysis is consistent with the requirements and procedures outlined in the current Orange <br />County Congestion Management Program (CMP). The CMP requires that a traffic impact analysis <br />be conducted for any project generating 2,400 or more daily trips, or 1,600 or more daily trips for <br />projects that directly access the CMP Highway System (HS). Per the CMP guidelines, this number is <br />based on the desire to analyze any impacts that will be 3.0% or more of the existing CMP highway <br />system facilities' capacity. <br />However, as noted in this focused traffic study, the proposed Project is expected to generate a net of <br />878 daily trips, and thus does not meet the criteria required for a CMP traffic analysis. Therefore, it <br />is concluded that the proposed Project will not have any significant traffic impacts on the Congestion <br />Management Program Highway System. <br />75B-111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.