projects are forecast to generate 30,720 daily trips, with 2,501 trips (1,176 inbound, 1,325 <br />outbound) anticipated during the AM peak hour and 2,962 trips (1,506 inbound, 1,456 outbound) <br />produced during the PM peak hour. <br />Existing Plus Project Traffic Conditions — The proposed Project will not significantly any of the <br />four (4) key study intersections, when compared to the LOS standards and significant impact <br />criteria specified in this report. Although the intersection of SR -55 SB Ramps at Fourth Street is <br />forecast to operate at LOS E during the AM peak hour with the addition of Project traffic, the <br />proposed Project is expected to add less than 0.010 to the ICU value. The remaining three (3) <br />intersections are forecast to continue to operate at an acceptable LOS with the addition of project <br />generated traffic under the Existing Plus Project traffic conditions. <br />Year 2019 Cumulative Traffic Conditions Plus Project —Traffic associated with the proposed <br />Project will not significantly impact any of the four (4) key study intersections, when compared <br />to the LOS standards and significant impact criteria specified in this report. SR -55 SB Ramps at <br />Fourth Street is forecast to operate at LOS E during the AM peak hour with the addition of <br />Project traffic, the proposed Project is expected to add less than 0.010 to the ICU value. The <br />remaining three (3) key study intersections are forecast to continue to operate at an acceptable <br />LOS with the addition of project generated traffic in the Year 2019. <br />Site Access Assessment— The three (3) proposed Project driveways under near-term (Year 2019) <br />traffic conditions at completion and full occupancy of the proposed Project. As shown, these key <br />study intersections are forecast to operate at LOS C or better during the AM peak hour and PM <br />peak hour. <br />• Internal Circulation Evaluation — The on-site circulation was evaluated in terms of vehicle - <br />pedestrian conflicts. Based on our review of the preliminary site plan, the overall layout does not <br />create any unsafe vehicle -pedestrian conflict points and the driveway throating is sufficient such <br />that access to parking spaces is not impacted by internal vehicle queuing/stacking. Curb return <br />radii have been confirmed and are adequate for service/delivery trucks and trash trucks. The on- <br />site circulation is very good based on our review of the proposed site plan, whereas the <br />alignment, spacing, and throating of the Project driveways is adequate. The circulation around <br />the buildings is adequate with sufficient sight distance along the drive aisles. <br />CMP Compliance Assessment — The proposed Project is expected to generate a net of 878 daily <br />trips, and thus does not meet the criteria required for a CMP traffic analysis. Therefore, it is <br />concluded that the proposed Project will not have any significant traffic impacts on the <br />Congestion Management Program Highway System. <br />State of California (Caltrans) Analysis for Existing Plus Project Traffic Conditions— Based on <br />the evaluation using Caltrans criteria, the proposed Project will not significantly impact either of <br />the two (2) state-controlled study intersections. Both intersections are forecast to continue to <br />operate at acceptable LOS C with the addition of project generated traffic under the Existing Plus <br />Project traffic conditions. <br />75B-126 <br />