My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - TUSTIN AND 4TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
75B - PH - TUSTIN AND 4TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:21:49 PM
Creation date
11/15/2018 9:19:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• State of California (Caltrans) Analysis for Year 2019 Plus Project Traffic Conditions— Based <br />on the evaluation using Caltrans criteria, the proposed Project will not significantly impact either <br />of the two (2) state-controlled study intersections. Both intersections are forecast to continue to <br />operate at acceptable LOS C with the addition of project generated traffic under the Year 2019 <br />Plus Project traffic conditions. <br />• Existing Roadway Segment Evaluation — The one (1) key roadway segment currently operates <br />at LOS A under Existing traffic conditions. <br />■ Existing Plus Project Roadway Segment Evaluation — The one (1) key roadway segment is <br />forecast to continue to operate at an acceptable service level on a daily basis with the addition of <br />Project generated traffic to existing traffic and will not have a significant impact. <br />• Year 2019 Cumulative Plus Project Roadway Segment Evaluation —The proposed Project will <br />not significantly impact the one (1) key roadway segment, when compared to the LOS standards <br />specified in this report. The one (1) key roadway segment is forecast to continue to operate at an <br />acceptable LOS with the addition of project generated traffic in the Year 2019. <br />75B-127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.