My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - TUSTIN AND 4TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
75B - PH - TUSTIN AND 4TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:21:49 PM
Creation date
11/15/2018 9:19:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program <br />Impacts Required Nlitigation,mcisures Implementation <br />VIII. Hazards and Hazardous Materials <br />Items (a), (b), end (c) <br />Due to the age of the existing budding, them is a potential <br />AIMHAZIAsbesrosAbateamene. Prior many <br />Implementing Entity: Project applicant/ <br />that asbestos containing mawrials (AC10) and, perhaps, lead- <br />demolition, a thorough asbestos survey is required in <br />developer and Certified Asbestos Consultant <br />base paint (I -BP) may be present. Exposure to either ACM of <br />accordance with the EPA and SCAQbID Rule 403. All <br />Monitoring o <br />g � ry' Ci ty of Santa Ana <br />LBP may expose construction wvrkets and people in the <br />onsite structures that contain wbesms must have the ACM <br />Planning and Building Agency (Building <br />vicinity of the project site to potential health risks. <br />removed according to proper abatement procedures <br />Safety Division) and the South Coast Air <br />recommended by the asbestos consultant and as requited <br />by the SCAQMD. All abatement activities shall be in <br />Quality Management District (SCAQMD) <br />compliance with Cahli nnia and Federal OSI IA, and with <br />Timing. Prior to demolition phase <br />the SCAQMD requirements. Only asbestos trained and <br />certified abatement personnel shall be allmved m perform <br />asbestos abatement. All ACM removed from onsite <br />structures shall be transported by a licensed to handle <br />ACM and disposed of at a licensed receiving facility and <br />under proper manifest Follovving completion of the <br />asbestos abatement, the asbestos consultant shall provide a <br />report documenting the abatement procedures used, the <br />volume of ACM removed, where the material was <br />disposed. Tliis report shall include transportation and <br />disposal manifests or dump tickets. The abatement report <br />shall be prepared for the property owner or other <br />responsible party, with a copy submitted to the SCAQMD <br />and the City of Santa Ana. <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />4 <br />75B-142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.