Laserfiche WebLink
Mitigation Monitoring and Reporting Program <br />Impacts Required Mitigation Measures Implementation <br />VIII. Hazards and Hazardous Materials Cad. <br />Due to the age of the existing building, there is a potential <br />MAI HAZ-1Ashesros Noddcation. SCAQMD Rule <br />Implementing Entity. Project applicant/ <br />that asbestos containing materials (ACM) and, perhaps, lead- <br />1403 establishes noti4ntion and work practice <br />developer and City of Santa Ana Planning <br />base paint (LBP) may be p s;enL Furposure m eitherAChl or <br />requirements to limit asbestus emissions from building <br />and Building Agency (Building Safety <br />LDP may expose construction unrkea and people in the <br />demolition and renovntion activities. State law requires <br />Division) <br />vicinity of the project site to potential health risks. <br />that a copy of the asbestos demolition notification form be <br />Monitoring Ci of Santa A <br />�g en ry' City na <br />provided to Building and Safety petsonncl prior m the <br />Planning aril Building Agency (Building <br />m <br />issuance of a demolition perit. Local governments are <br />Safety Division) and the South Coast Air <br />responsible for the asbestus notification process. <br />Quality ivlaaagement District (SCAQh1D) <br />Timing. Prior to and during demolition/ <br />construction phase <br />AIMHAZ-5 Lead BasedPaiarRemoml. Prior to the <br />Implementing Entity. Project <br />issuance of a permit for demolition of any structure, a <br />applicant/developer and licensed Lead Based <br />licensed LBP professional shall be contacted to evaluate <br />Paint wnsulumt <br />the structure for LBP. If LBP is discovered, it shag be <br />MonitoringCi of Santa Ana <br />City <br />removed according to proper abatement procedures <br />an�B°cy' <br />Planning and Agency ng <br />recommended by the consultant and in accordance with <br />Safety Division) and the South Coast Air <br />n) an t Coast Ai <br />SCAQMD, State of California and Federal requiranents. <br />Only LBP trained and certified abatement personnel shall <br />Quality Management District (SCAQMD) <br />be allowed to perform abatement activities. Ag LBP <br />Timing. Prior to and during demolition <br />removed from these structures shag be hauled and <br />phase <br />disposed of by a transportation company licensed m <br />transport this type of material, In addition, the material <br />shag be taken to a landfill or receiving facility licensed to <br />accept the waste. Following completion of the LBP <br />abatcmcn4 the LBP consultant shag provide a report <br />documenting the abatement procedums used, the volume <br />of LBP removed, where the material vvas moved to, and <br />include transportation and disposal manifests or dump <br />tickets. The abatement report slag be prepared for the <br />Property ownet or other responsible patty, with a copy <br />submitted to die SCAQMD and the City of Santa Ana <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />5 <br />75B-143 <br />